1. The Name Of The Task Provided By The Ordering Party: Reconstruction Of Poviat Road No. 3277D Wyszki - Ponikwa, Km 5 + 000 - 10 + 566 [Flood - September 2024] 2. The Subject Of This Public Contract Are: Construction Works3. The Scope Of The Subject Of The Contract Includes:- Execution Of Retaining Walls;- Tree Felling;- Preparatory And Demolition Works;- Earthworks;- Dehydration Of The Road Body;- Construction Of A Foundation And Surfaces;- Implementation Of Pavements;- Execution Of Street Elements;- Other Works; 4. A Detailed Description Of The Subject Of The Contract Is Specified In: 1) Auxiliary Cost Estimate - Annexes 11 To Swz2) Drawing Documentation - Annex 12 To Swz3) Technical Description - Annex 13 To Swz5. Detailed Technical Conditions For The Execution Of Works Are Specified In: Detailed Technical Specification (Sst) - Annex 14 To Swz.6. In Each Case Of Use In The Design Documentation References To Standards, European Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law Act, The Contractor Should Assume That Such Reference Is Accompanied By Or Equivalent Words. In The Case Of Use In The Project Documentation References To Norms, European Technical Assessments, Technical Specifications And Technical Reference Systems, The Contracting Authority Allows Equivalent Solutions Described. When Analyzing The Project Documentation, The Contractor Should Assume That Each Reference Used In The Project Documentation Is Accompanied By A Or Equivalent Word. In The Case Of When In The Design Documentation Or Technical Specifications Of The Performance And Acceptance Of Works, Trademarks Have Been Used, This Means That They Are Given, For Example And Specify Only The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Apply Equivalent Materials Or Devices, But With Technical And Quality Parameters Similar Or Better, Which Will In No Way Affect The Negative-Not The Proper Functioning Of The Solutions Adopted In The Project Documentation. The Contractor Who Uses Devices Or Equivalent Will Be Obliged To Show During The Performance Of The Order That The Devices And Materials He Used Meet The Requirements Set By The Employer. The Use Of A Label In The Design Documentation Means That The Employer Accepts All Labels Confirming That The Details, Deliveries Or Services Meet The Equivalent Requirements Of The Label Specified By The Employer. In The Event That The Contractor For Reasons Beyond His Control Cannot Be Obtained By The Label Or Equivalent Label, The Contracting Authority, Within The Time Limit, Accepts Other Relevant Evidence, In Particular The Technical Documentation Of The Manufacturer, If The Contractor Proves That The Construction Works, Supplies Or Services To Be Made By Him, Meet The Requirements Of A Specific Label Or Specific Requirements. Indicated By The Contracting Authority. 7. Using In The Project Do
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.