1. The Subject Of The Contract Is Construction Works On The Investment Task Entitled Construction Of A Sanitary Sewage Network In Sanoczek. 2. A Detailed Description Of The Subject Of The Contract Can Be Found In Annex 1 To Swz - Documentation. It Consists Of The Following Documents: 1) Architectural And Construction Project, 2) Bill Of Quantities, 3) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb). In Connection With The Fact That The Remuneration Will Be A Cost Estimate, The Bill Of Quantities Attached To Swz Is Binding. The Contractor Is Obliged To Draw Up An Offer Cost Estimate Based On The Bill Of Quantities Received From The Contracting Authority, Using The Price Base He Adopted To Cost And After Adding Vat. The Offer Cost Estimate Must Be Compatible With The Works Of The Works And Should Contain The Basis For The Valuation Of The Works, A Description Of Works In Accordance With The Description Included In The Preface Of The Works, The Measurement Used In The Preface Of The Works And The Flat -Rate Net Unit Price For Each Item. The Offer Cost Estimate Should Be Drawn Up In Accordance With Point 13.4 Swz.Uwagaw Connection With The Lack Of Catalogs In The Cost Estimate Of The Ordering Party Regarding Electrical Works, The Ordering Party Allows The Possibility Of Introducing Changes In The Offer Cost Estimate Only In The Element Entitled. Energy Attachment Of The Sewage Pumping Station In Formal Terms, Ie By Adding In Positions In The Base Of Catalogs As Described For A Given Position. The Units Of The Measure And The Number Of The Contractor Should Be Maintained In Accordance With The Assigned To The Item. The Change In Question Will Not Be Categorized As A Change Of Cost Estimate Causing Rejection Of The Offer. 3. Equivalent Solutions. In Each Case Of Use In The Description Of The Subject Of The Order Of Norms, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, The Contractor Should Assume That Such As Accompanied By The Words Or Equivalent. In The Case Of Use In The Project Documentation References To Standards, European Technical Assessments, Approval, Technical Specifications And Technical Reference Systems, The Employer Allows Equivalent Solutions. The Contractor, When Analyzing The Project Documentation, The Bill Of Quantities Should Assume That Each Reference Used In The Project Documentation Is Accompanied By A Or Equivalent Word. In The Case, When In The Design Documentation, The Pre -City Of Works Has Been Used Trademarks, It Means That They Are Given, For Example And Specify The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Apply Equivalent Materials Or Devices, But With Technical And Quality Parameters Not Worse Or Better, The Use Of Which Will In No Way Negatively Affect The Proper Functioning Of The Solutions Adopted In The Project Documentat
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.