Construction Work - Trade 07 Dw Sandwich Roofing, Suggested Facade Dorum, Wremen. The Individual Services Are As Follows: Fire Brigade Wremen, Including 4 Pieces, Hall Ties Made Of Wood - 10 Pcs. Pressure Pipes - 12 Pcs. Wind Tables - 117 M Steel Pods - 12 Pieces - 386 M² Sandwich Roofing - 63 M² Ridge, Location -Speed Drainwear - Roof Drainage And Galvanized And Galvanized Channels - 200 M² Sandwich Facade On Aluminum Construction And Thermal Insulation - 27 M² Fiber Cement Facade On Aluminum Construction And Thermal Insulation Fire Brigade Dorum, Including 6 Pieces, Hall Ties Made Of Wood - 14 Pieces Of Pressure Pipes - 12 Pcs. 162 M Steel Pages - 16 Pc. Turn -Away Drainwear - Roof Drainage From Flat Roof Inlets And Galvanized Gutters And Downpipes - 240 M² Sandwich Facade On Aluminum Substructure And Thermal Insulation - 31 M² Fiber Cement Facade On Aluminum Substructure And Thermal Insulation The Execution Times Are Provided: Fire Brigade Below 04.04.20226 Fire Brigade Dorum 05/20/2026 To 24.07.2026 For Further Information, Reference Is Made To The List Of Services And The Other Documents.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.