The Subject Of The Contract Is The Execution Of Construction Works Involving The Renovation Of Rooms Located In The Building Of The Praga-Północ District Office At Ul. Father I. Kłopotowskiego 15 In Warsaw And Including: Replacement Of The Carpeting, Renovation Of The Electrical Installation, Replacement Of Old Lighting For Led Energy -Saving Lighting And Painting Walls And Ceilings In The Rooms And The Hall Of The Office At The 0 Level In The Building Of The Office Of The City Of Warsaw, The Praga - North District At Ul. Kłopotowskiego 15 In Warsaw1. Accompanying Activities - Protection Of The Door And Window Joinery, Protection Of Radiator Shields, - Securing Cork Boards Provided For Re -Assembly - The Place Will Be Indicated By The Contracting Authority, Transfer, Securing And Setting Furniture, Cleaning After Works, Waste Removal, - Carrying Furniture To The Corridor, Protection Against Dust, Bringing After The Ordering Dust To The Place Indicated By The Ordering Party, Securing Ceiling Lamps Or Disassembly And Re -Assembly - To The Contractors Decision, - Cleaning Work After Construction Works, - Renovated Rooms Should Be Closed Tightly For The Time Of Renovation Using A Dust Curtain, Thus Securing The Remaining Parts Of The Object Against Pollution, - Rooms Intended For Reception Should Be Ordered, Washed, Left Without Construction Dust, - Other Necessary For Proper Functioning, - Other Office. Rooms And Entrance Hall For The Building- Preparation In The Indicated Rooms And The Hall Of The Surfaces Of The Walls And Ceilings To A Uniform Surface By Removing The Flaky Paint Coating, Filling Of Scratches, Cracks, All Holes In Dowels, Nails, Screws And Etc.- Supplementing Plaster Defects, Cracks Repair, Bullshit, Primension Of The Surface Of The Walls And Ceilings With A Primer, -2 -Times Painting Paint - Paint The Walls With Washable Paint, Resistant To Abrasion, Ceiling - With White Emulsion Paint, - Removal Of The Old Floor Covering, - Leveling Of The Floor Surface, Position Of The Self -Leveling Mass In The Rooms - Laying A New Cover With High Electrostatic Resistance. Intended For Office Rooms (Carpeting Is Provided By The Contracting Authority),-Replacement Of Skirting Boards And Repairing Places After Breaking Old Skirting Boards,-Replacement Of Ventilation Grilles In The Indicated Rooms,-Replacement Of Electrical Installation In The Indicated Rooms,-Laying Cables With A Total Cross-Section Of Veins For Cu-6/Al-12 Mm² For Nesting (Labor + Materials) With Forging Furrows And Plastering - Assembly Of Handles For Wires, Screwing To Dowels (Labor + Materials) In Concrete Substrate - Replacement Of Electrical Outlets In The Indicated Rooms, - Replacement Of Old Lighting Fixtures For Energy -Saving Led Lighting, In The Indicated Rooms. The Implementation And Acceptance Of The Subject Of The Contract Is Determined By: A) The Proposed Provisions Of The Contract Together With Attachments - Annex 6 To Swzb) Description Of The Subject Of The Contra