Part 1: Purchase, Delivery And Replacement Of A Gas Furnace At The Headquarters Of The Municipal Office In Sulejiszczekółowy. Description Of The Subject Of The Contract: The Subject Of The Contract Is A Comprehensive Service Consisting In: • Dismantling Of An Existing 100Kw Gas Boiler At The Municipal Office In Sulejów, Ul. Konecka 42, • Delivery, Assembly And Launching A New Heat Source With A Power Corresponding To The Current Demand (Approx. 100Kw), • Adaptation Of Gas, Heating And Chimney Installations, • Performing A New System Of Exhaust Gas Drainage (Chimney) - In Internal Or External Variant - Depending On The Technical Conditions. Condensing Boiler: Heating Power: Min. 95Kw, Max. 110Kw, Range Of Power Modulation: At Least 1: 5, Condensing Boiler, Hanging Or Standing, With A Closed Combustion Chamber, Purpose: Heating Rooms + Possible Cooperation With The Cwu Tank. Warrant B - Cascade System: 2 Condensation Gas Boilers After ~ 50Kw Each, Cascade System With Automatic Operation Of Equipment Controlling Operation. Alternating Or In Parallel, The Possibility Of Independent Servicing Of One Boiler Without Interrupting The Systems Operation. Parameter Requirement Minimum Gas Boiler, Condensing, Single -Function Or To Cooperate With The Cwuzakres Tank Of Power Modulation Min. 1: 5 Zasilanie 230 V / 400 V - According To The Requirements, Automatic, Weather, With External Temperature Sensor Documation And Certifications, Ce Certificates, Declaration Of Compliance, Instructions In Polish, The Manufacturers Appointment Min. 24 Months. The Scope Of The Order Includes The Following: Preparatory Work: Assessment Of Assembly Conditions And Technical Capabilities For The Chimney And Boilers, Agreeing On The Execution Variant With The Ordering Party, Servicing - In Accordance With The Manufacturers Recommendations. Deparation And Utilization: Dismantling Of An Existing Gas Boiler (100Kw) And Unnecessary Elements, Export, Utilization, Ordering Of The Assembly Place Heat: Delivery And Assembly Of The Selected Boiler/Boiler Variant, Connection To The Existing Heating And Gas System, Replacement Or Modernization Of Valves, Filters, Protection, If Necessary: Adaptation Of The Electrical Installation And Automation Chimney, Variant 2: Installation Of An Insulated External Chimney On The Building Facade, The Chimney Must Be In Line With The Requirements Of The Boiler Manufacturer And Fire Protection Regulations And Documentation: Launching The Boiler/Cascade, Control Configuration, Execution Of Tightness, Functional And Safety Attempts, Drawing Up The Reception Report, Transfer Of As -Built Documentation, Certificates, Ce Declaration, Orders Should Train Staff In The Field Of Installation Service And Maintenance. In Order To Properly Prepare The Offer And Identify Possible Technical Difficulties, It Is Recommended That The Contractor Perform A Local Vision At The Place Of Performance Of The Contract. The Contractor Ensures Safety In The Field Of Work. During