Firefighting Vehicles - Delivery Of A Heavy Chemical Rescue Car. 1) The Subject Of The Order Is The Delivery Of A Heavy Chemical Rescue Car. The Contracting Authority Requires That The Vehicle And Buildings Be: Factory New, Technically Efficient, Not Having Physical Defects (Construction, Material And Executive) Or Legal Defects, And Meeting The Requirements Specified In The Applicable Law, In Particular In The Scope Of Admission Of The Vehicle To Road Traffic, In Accordance With The Requirements Specified In Opz And The Designed Contractual Provisions, Year Of Production Of The Chassis 2025, Engine, Chassis And Cabin Of The Same Manufacturer. 2) The Contractor In The Offer Price Should Take Into Account: - Preparation Of The Vehicle In Accordance With The Requirements And Described In Opz And The Provisions And Standards Indicated In Opz, - Obtaining All Required Certificates Of Approvals, Certificates, And Providing Them To The Ordering Party, - Transfer To The Contracting Authority Of Documents Indicated In Opz - In This Instructions - In This Instructions - In This Instructions, - Conducting Training From The Basic Service Of The Car In Question. The Contractor Will Have A Full Fuel Tank And Completed Other Operating Fluids. 3) The Contractor Is Obliged To Carefully Check The Description Of The Subject Of The Contract Due To The Fact That The Delivery Contract Is A Flat -Rate Contract. 4) All Offered Materials Must Be Free From Physical And Legal Defects, Free From Third Party Rights And Cannot Be Subject To Any Proceedings And Security 5) Receipt Of The Subject Of The Contract Will Take Place At The Contractor. 6) A Detailed Description Of The Subject Of The Contract Can Be Found In Annex 1A To Swz (Opz) And In The Planned Contractual Provisions. 7) The Contracting Authority Requires That The Warranty Period Be At Least 36 Months, The Extension Of This Period Is Assessed Under The Offer Evaluation Criterion. In Addition, The Contracting Authority Requires That The Warranty Period For Defects Should Be Equal To The Period Of Quality Guarantee. 8) During The Warranty Period, The Contractor Is Obliged To Perform All Service Activities (Inspections) On His Own Expense And At Their Own Expense, Indicated In Service Books, User Manuals Or Other Documents Regarding The Car And Building Elements, Including The Replacement Of Materials, Oils And Operating Fluids And Other Elements Subject To Periodic Replacement. The Method Of Performing The Website Is Described In The Designed Contractual Provisions, Constituting Annex 9 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.