General Construction Work For Pipelines - Cl 20- Design And Execution Works At Sources, Master, Tanks - Tismana And Pestisani. The Total Quantity Or Domain Works On The Design And Execution Of Works Include: -The Design Activities Refer To The Detailed Technical Project. The Project Will Include, Among Other Things, All The Necessary Documents (Such As Memoirs, Drawings, Calculations, Etc.) For The Elaboration Of The Technical Project In Accordance With The National Legislation And Any Documentation Necessary To Obtain The Building Permits. -Elaboration Of The Documentation Necessary To Obtain The Authorizations And Opinions Necessary For The Execution -Construction Work For: Sector 1: Tismana Water Supply System, For Which The Following Works Were Proposed: Water Source -Object 1.1 -Rehabilitation Of Tissue Water Treatment -Object 1.2 -Retehnologization Storage: -Object 1.3 -Rehabilitation Tanks V = 2X200mc Of -Object 1.4 -Rehabilitation Tanks V = 1X200mc, 1X300mc Rusaata -Object 1.5 -Integration In The Decade Tank V = 500Mc Stap Tismana Sector 2: Sohodol Water Supply System, For Which The Following Works Were Proposed: -Object 2.1 -Rehabilitation Source Sohodol Treatment Facilities -Object 2.2 -New Chlorination Station For Sohodol Storage Reservoirs: -Obte 2.3 -Making New Storage Tank V = 75Mc Sector 3: Pestisani Water Supply System, For Which The Following Works Were Proposed: Adduction/Transport -Object 3.1 -Rehabilitation Of Pestisani And New Connection To The Vaja Adduction Treatment Facilities 3.2 -Realization Of The New Pestisani -Object 3.3 -Realization Of The New Borosteni Chlorination Station: V = 2X1000mc -Object 3.5 -News Of New Storage Tank V = 100Mc For All The Above Mentioned Investment Objectives, The Following Activities Will Be Carried Out: -Furnishing And Mounting Fittings And Reinforcements; -The Realization Of All The Necessary Works For The Automation And Transmission Of The Data, In The Locally And The Regional Subtraction -Task And Commissioning -The Monitoring Of The Functioning And The Granting/Consulting Of The Personnel, During The Guarantee Period, When Necessary -The Re -Election Of Any Defects That Appeared During The 36 -Month Warranty Period. -Installing The Beneficiary And/Or Operator
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.