Coastal-Defence Works-Coastal Feeding And Cleaning 2026-2029. The Contract Includes Coastal Feeding On The West Coast Of Jutland And Purification In Harbor Basins, Entrance And Sailing Primarily Along The West Coast Of Jutland And In The Limfjord. The Contract Will Uncover A Political Agreement Between The State And The 4 Affected Municipalities (Ringkøbing-Skjern, Holstebro, Lemvig And Thisted) On Coastal Protection On The Lodbjerg-Nymindegab Section On The Jutland West Coast Contract Is Concluded For A 4-Year Contract Period, And There Will Be The Possibility Of Extending The Contract 2 Times 12 Months. Work On Coastal Feeding Will Include Beach Feeding And Coastal Feeding. At Beach Feeding, The Sand Must Be Pumped And Evenly Distributed On The Beach. For Coastal Feeding, The Sand Must Be Delivered Coastal Within -6 M Depth Basket. The Method Is Optional And Can E.G. Be By Split Vessel, By Rainbowing, By Pumping Through Pipeline Or Other. The Feeding Sections And The Placement Of The Sand In The Coastal Profile Are Described In More Detail In The Tender Material. There Are Special Restrictions On The Work Of Coastal Feeding (Eg Certain Working Periods At Beach Feeding And Others). This Is Described In More Detail In The Tender Material. The Sand For Coastal Feeding Must Be Recovered In Recovery Areas In The North Sea. Only Tshd (Trailing Sucction Jumps Dredger), Ie. Towing, At The Recovery. In Coastal Feeding, The Annual Quantity, Which Is To Be Delivered On Several Different Stretches On The West Coast Between Nymindegab And Agger, Is Estimated To Be Approx. 3.6 Million M3 Sand. The Cleansing Will Have To Take Place In Both Large And Small Sailing And Entrance (Eg Grådyb And Sælhundeholm Race) And In Both Large And Small Harbor Basins, Such As. In Esbjerg Harbor And In Rømø Harbor. The Sites Are Described In More Detail In The Tender Material. There Is A Requirement For The Use Of Special Environmental Murder In Some Purification Tasks. The Estimated Total Annual Amount Of Sand And Port Sediment For All Purification Tasks Will Be Approx. 1.7 Million M3 And 265,000 Tds (Tons Of Dry Matter, But The Amount Is Dependent On Weather And Flow Conditions And Can Therefore Vary Greatly.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.