The Sveagorg District Is Located In The North Of Schiedam And Was Built In The Period 2004 To 2007 On A Former Dredger Specieloswal. Since Delivery, The Neighborhood Has Sagged More Than Average (Up To 70 Cm), Creating Problems With The House Connections Of The Utilities, Accessibility Of The Houses (Because The Distance Between The Sill And Soil Increases) And The Highlight Of The Sewer. The Quay Construction Of The Present Inner Waterway, Consisting Of A Block Wall, Has Also Been Sagged. In Order To Keep Future Management Costs Low And To Increase The Life Cycle Of The New Establishment To Be Applied, The Neighborhood Is Raised Weight -Neutral By Using Light Raising Materials Such As Glass Foam And Eps And The Gift Structure Is Replaced By A Setting -Free Sheet Wall Construction With Decorative Strip. At The Same Time, The Sewer Of The Dry Weather Is Replaced And The Cables And Pipes Present By The Utility Parties At Height The Nature Of The Assignment Is A Work. The Work Concerns The Removal Of The Old Quay Construction And Delivering And Applying A Steel Sheet Pile Construction With A Plastic Ornamental Strip With Wood Motif On The Front, Applying The Element Paving And Replacing Sewerage Tubes. Light Lifting Materials Are Also Supplied And Applied.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.