The City Drainage Fürth (Stef) Intends To Replace The Public Mixed Water Canals Made Of Stoneware In The Intersection Of The Kaiser And Neumannstrasse. The Construction Work Is Located In Zone Iii A Of The Rednitztal Water Protection Area. The Planned Channel Construction Measures Comprises The Replacement Of 2 Attitudes Of The Mixed Water Canal, As Well As The Replacement Of 2 Existing Shafts. 3 Shafts Are Rebuilt In The Intersection Of The Kaiser/Neumannstrasse. In The Course Of The Change, Both Attitudes Are Being Dimensioned (Stz Dn350 -> Stz Dn400 And Stz Dn 450 -> Stz Dn500). The Canal Change Comes Between 4.7 M And 5.2 M Below The Existing Edge Of The Street. The Entire Construction Length Is Approx. 124 M. After The Change, Another Attitude In Kaiserstrasse With A Length Of Approx. 39 M Is Pressed.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.