The Düren Innovation District (Iq-Dn) Is Being Built On The Düren Station Area. The Iq-Dn Project Includes Various Planning Areas, Including The Innovation Band Part B. The Subject Of The Services Described Here Is The Development Of This Sub-Area. The Present Tender Includes The First-Time Production Of Rain And Dirty Water Channels Including The House Connection Lines And The Expansion Of Traffic Areas In The Form Of A Construction Road Including The Necessary Earth Construction Within The Affected Planning Area. (Mfp). The Lines Are Gradually Being Laid Out In The Course Of The Earth Building By The Pension Funds. In Addition, The Lighting System Including Cable Laying Within The Area Is Implemented. The Drainage In The Area Takes Place In The Separation System And Has A Total Length Of Around 210 M. The Dirt And Rainwater Channels Are Laid In Concrete/Reinforced Concrete (Rw) And Stoneware (Sw) In Different Diameters. Among This Is The Laying Of A Storage Space Channel In Diameter Dn 1,600. The Road Expansion Takes Place In The Form Of A Construction Road And Extends To Approx. 250 M. In The Upper Section, The Promenade Of The Innovation Band Is Structurally Connected To The Arnoldsweilerstrasse. Basically, The Cross-Section Consists Of The Elements (Asphalt), Adjoining Facilities (Gravel / Sidewalk) And Banquet / Embankment. The Sewer And Road Construction Work, Including Earthworks, Including Earthworks, Is Divided Into Two Consecutive Construction Phases, Which Are Imperative And Observing, Based On The Construction Work. The Interfaces Of The Build-Up And Civil Engineering Run Smoothly And Mutual Disabilities Can Be Completely Excluded.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.