Mass Or Short Description: The Maria-Frieden School In Coesfeld Is To Be Expanded In Two Separate Construction Phases By April 2027 And Then The Stock Is Being Renovated. The Building Is A Primary School From The 1970S In Concrete Skeleton Construction. The Existing Building With A Sports Hall With Approx. 2740 + 525 M² Bgf Receives A New Facade; Roof Structures, Tga And Interior Design Are Renewed. The Existing Building Is Expanded By An Extension Of Two -Story With Approx. 1520M² Ggf And A Smaller One -Storey Cultivation With Approx. 215 M² Ggf.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.