The Subject Of The Contract Includes The Implementation Of Project Documentation (Design) And Construction Works (Construction), As Well As The Supply Of Equipment For The Task Involving: A) Separation And Adaptation Of The Basement, Intended For The Room Of A Gas Boiler Room To The Applicable Regulations, Obtaining A Derogation In This Respect, B) Adaptation Of The First Floor Of The Building For The Needs Of The Functioning Of The Second Adaptive Work With The Necessary Adaptive Work Pursuer Building, C) Adjusting Selected Rooms On The Ground Floor In Connection With: • Installation Of An Electrical Lift, • Renovation And Construction Works Within The Cloakroom Rooms, • Installation Works Within The Created Room Of The Cloakroom, • Renovation And Construction Works Within The Truck Room (Sub -Space Space), • Piercing Of New Door Openings (Entrance Between The Elevator, Crossing And The Room Of Younger Children), • Removing The Collision Of The Designed Doors With An Existing Electric Switchgear, • Installation Works Within The Truck Room (Podside Space), • Separation Of The Technical Floor Of The Basement With The Door Of The P-Pj (Unless Expertise Or Provisions Of Kw Psp , Floors, Ceilings, Floors, In A New Functional System- According To The Attached Partnership (Annex 02), • Demolition Of The Blind Ceiling Over The Ground Floor Ceiling (Within Existing Toilets), Eliminating The Difference In Levels Between The Room Of The Former Bathroom (The Area Indicated On The Projection And The First Floor), • Separating Their Staircases And Enclosing Them (Unless Expertise Or Resolution Of Kw Psp Indicators), • Protection Of Wooden Ceilings (Above The Ground Floor And Above The First Floor) Due To The Safety Of Use Icevancies Of P-Poż, • Installation Works Within The Designed Rooms). Installation And Supply Of An Electrical Lift In The Elevator Shaft Secreted From Existing Rooms, F) Design And Assembly (In The Entire Building, Also In The Space, Also In The Part Of The Building), Identification Elements) Visual (Such As Typhlographic Interaction, Or Description Of The Rooms In The Braille Language Using High Contrast For The Visually Impaired, The Fields Of Attention Ilin, Contrasting Door Handles, Contrasting Door Frame Frame, Etc.), Related To Providing Special Needs For Persons, G) Purchase, Delivery And Installation Of Equipment (According To Annex 03 To Pfu), Applies To:- Item 12- Projector Displaying Applications And Games, Ceiling,- Item 46- Buildings In The Social Room,- Item 51- File Wardrobe In The Directors Office,- Item 63- Automatic Washing Machine In The Auxiliary Room On The First Floor,- Item 64 - Automatic Dryer In The Auxiliary Room On The First Floor. Note! The Contractor Of The Order In The Design+Build Formula Should Guarantee The Proposed For The Following Solutions: For Safety Of Use, For The Safety Of Construction, Stability Of The Structure, For Fire Safety, For Protecting The Interest Of Third Parties, For Respecting The Tissu