The Scope Of The Work Includes: Scraping Efflorescence And Traces Of Flooding, Putting The Walls And Ceilings, Prime That And Painting With Emulsion Paint According To The Color Indicated By The User. The Substrates Should Be Cleaned Of Dust And Dirt, The Protruding Plaster Should Be Reflected And The Scratches Should Be Widen And Filled With Cem-Wap Mortar. Before Painting And Filling With Paints, It Should Be Primed With Deep -Pitted Primers. The Color Of The Coatings Should Be Uniform, Without Streaks And Stains And Signs Of The Brush. Making Ceramic Tiles. Species 1. Ceramic Wall Tiles. Species 1. Replacement Of External Doors For Aluminum Doors Warm, Full Brown With Full Extensions, Three Locks In All Doors. Replacement Of The Sewage System With Pipes In Pipes 160 Mm Sn8 In The Excavation. Performing A Pipe Through An Asphalt Road With A Restoration To The Previous State Of Asphalt. Replacement Of Internal Water And Sewage Installation From Polypropylene Pipes. Replacement Of The Compact And Sink. Stabbitation Behind The Wall With Hpl. Cover The Walls And Floor With Ceramic Tiles On The Glue. Leading Out The Sewer Above The Roof Of The Building With Protection Of The Thermosal Roofing Felt. Replacement Of The Electrical Installation In The Bathroom Room With 3X2.5Mm Cables. Apply Bathroom Lamps. Replacement Of Security In The Fuse Box.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.