The Contract Is A Total Contract (Ku). The Contract Includes The Total Price And Unit-Priced Parts. The Silos Have Been Mined Into The Rock. The Silos Have An Entrance To The Main Entrance Tunnel Of The Rock Protection. The Volume Of The Sand Silo Is 3,000 M3 And The Volume Of The Salt Silo Is 800 M3 And They Are Completed In 1993. The Concrete Deck Structures Of The Silos Are On The Ground. The Renovation Project Will Demolish And Renew Structures And Building Components To The Extent As Planned. Contracts Include The Contract Documents With All The Road Arrangements, Equipment And Equipment. A More Detailed Description Is In The Documentation Of The Invitation To Tender. The Project Is A Joint Acquisition With The Ely Center And The City Of Orimattila. The Date Is:- 22.09.2025 At 2:30 Pm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.