GTR 101904209
Tenders Are Invited For Construction Of A Sanitary Sewage System In Łódź
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
101904209
Tendering Authority
Subscribe to view
Tender No
IN.271.3.8.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Sanitary Sewage System In Łódź
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
01-10-2025
Closed
Work Detail
Construction Of A Sanitary Sewage System In Łódźzakres Works In Accordance With The Attached Judgment, A Preliminary And Documentation. News! Part Of The Documentation (Camera) Due To The High Weight Of The Files, You Should Download From The Ftp Disk. Ftp.Steszew.Pl Ftp User User: [email protected]ło: Wmamamwk#1M5! In Case Of Problems With Downloading Files, Please Report Problems To The Employer. The Contractor Will Perform All Necessary Work For The Correct Performance Of The Subject Of The Contract, Along With The Start Of The Devices And Training Of User Employees. The Work Should Be Carried Out In Accordance With The Tender Documentation And In Consultation With The Employer. In Addition, The Scope Of Work Includes: 1) Preparation Of Full Documentation - 2 Copies In Polish, Which Consists Of: A) As -Built Documentation: B) Approvals For Materials And Prefabricated Elements, C) Operating Instructions And Operation Of Devices 2) Of The Work Acceptance. 3) Required Documents Regarding Research, Measurements And Checks Carried Out By The Contractor, Technology Of Performing Works: Work Related To The Implementation Of The Investment Should Be Carried Out In Accordance With Applicable Standards, Building Law, Laws Regarding Technical Requirements, Environmental Protection, In Accordance With Health And Safety And Technical Knowledge. All The Materials Used Must Have Appropriate Approvals, Approvals And Certificates As Well. In Addition, Each Material Used Should Be Agreed With The Contracting Authority, The Lack Of Agreement Will Result In The Replacement For The Appropriate, The Cost Of Replacement Will Be Fully Incurred By The Contractor. If The Contractor Does Not Comply With The Recommendation, The Ordering Party Will Order The Above Actions To A Third Party And Deduct The Costs He Incurred From The Contractors Remuneration, And When This Amount Proves Insufficient, He Will Reim The Subject Of The Order. The Application Allows The Use Of Materials, Solutions, Technologies And Equivalent Standards With Technical, Construction And Utility Parameters No Worse Than Those Assumed In The Technical Specification And Receipt Of Construction Works And Design Documentation. The Removal Requires The Submission Of Relevant Documents, Authenticating These Materials. The Contractor, At His Own Responsibility And At Its Own Expense, Should Take All Preventive Measures Required By Reliable Construction Practice And Current Circumstances To Secure The Rights Of Owners Of The Property Adjacent To The Construction Site/Works And Avoid Causing Any Disturbances Or Damage There. The Contractor Is Responsible For Any Damage Resulting From The Implementation Of The Subject Of The Contract In Relation To Third Parties. The Method Of Permanently Protect Against The Impact Of Works. The Location Of The Location Informs That Before Starting The Tender, The Contracting Authority Requires That The Contractor Performs A Local Vision Of The Place Where The S
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
246da86f-7111-4f7b-a81e-5a2ddd637d52.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.