1) Name Given To The Order: Creation Of An Active Playground At The City Nursery In Karlino, 78-230 Karlino, Ul. Moniuszki 8 (Repeated Procedure) .2) The Scope Of The Subject Of The Contract Includes, In Particular: The Scope Of Planned Works Includes The Comprehensive Implementation Of The New Playground In The Immediate Vicinity Of The Nursery Building On Plot No. 121/4. Records: 0004, 320103_40004 In Karlin. Guilt Works Start With Preparatory Activities That Include Dismantling Of Existing Playground Devices. Then, Earthworks Should Be Carried Out, Including Land Leveling, Surface Alignment And Removal Of Field Obstacles, Which May Hinder The Installation Of New Devices And Surfaces. Purchase And Assembly Of Playground Devices. The Planned Devices Will Include: A Dual Swing Of The Stork Socket (1 Item), Which Will Allow The Fun Of More Children, A Fitness Path (1 Item), Which Will Develop The Motor Skills Of Children, And A Multi -Functional Device - A Play Kit (1 Pc), Which Will Include Various Attractions, Such As Slides, Ladders And Other Elements Stimulating Physical Development. In Addition, A Double Spring Swing Will Be Installed (1 Item). As Part Of Small Architecture, It Is Also Planned To Buy And Install Three Benches, Which Will Ensure A Place To Rest For Carers, And One Trash Bin, Which Will Ensure Order On The Playground. The Planned Surface Should Be Made Of Sbr And Epdm Granules With An Area Of 216 M2. The Entire Planned Investment Aims To Create A Modern, Safe And Ecological Playground, Which Will Not Only Provide Children With A Place To Play, But Will Also Promote Pro -Ecological And Educational Attitudes. A Placement Of 8 Concrete Pots With Low Long -Term Vegetation Is Planned At The Playground. Completion Of The Task Should Be Understood As The Date Of Issuing The Document From The Control (The Control Playground Documented, Confirming The Compliance Of The Playground And The Surface With Pn-En 1176 Or 1177 Standards Issued By An Independent, Specialized External Control Unit That Was Not Directly Involved In Assembly And Is Not Responsible For Any Repair Work And Related Expenses). The Protocol Should Be Delivered Up To 30 Days From The Date Of Completion Of The Work, Confirmed By The Reporting Report. The Concise Scope Of The Subject Of The Contract Was Specified In The Project Documentation, Technical Specification And Acceptance Of Construction Works, Description Of The Subject Of The Contract (Opz) And In The Draft Contract. These Documents Constitute Attachments To Swz.3) In All Places Of Swz Or Its Attachments, In Which An Example Trademark, Patent, Origin, Source Or Special Process Were Used, Or If The Contracting Authority Described The Subject Of The Contract By Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, This Is Justified By The Specificity Of The Subject Of The Contract
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.