1 As Part Of The Investment, The Thermomodernization Of The Building Is Also Planned To Replace The Roofing, On The Plot No. 220 Located In Korczew, Korczew Commune. The Scope Of Work Includes: • Demolition Works • Renovation Works • Curning Of The Area With Concrete Cubes • Terrain Fence • Electrical Installations • Sanitary Installations • Sanitary Installations • Equipment Of Construction Works Determined: 1) Construction2) Bill Of Quantities3) The Technical Specification Of The Implementation And Acceptance Of Works Is Responsible For The Quality Of Their Implementation And Their Compliance With The Technical Specification As Well As The Provisions Of The Construction Law And Construction Art. The Remuneration For Performing The Subject Of The Contract Will Be A Flat -Rate Nature. 2. The Contracting Authority Informs That It Is In The Process Of Obtaining A Decision Authorizing The Reconstruction And A Change In The Use Of The Kindergarten Building To The Childrens Club. 3. The Employer Informs That The Bill Of Quantity Attached To The Specification Is A Secondary Study In Relation To The Technical Specifications Of The Implementation And Acceptance Of Renovation Works. The Statements Contained In The Pre -City Are To Illustrate The Scale Of Construction Works And Help Contractors Estimate The Investment Costs. The Bill Of Quantity Is Only An Auxiliary Document. 4. Listed In Any Part Of The Description Of The Subject Of The Contract, The Name, Brand Or Origin Of Products Or Materials Are Not Obligatory For Contractors. Contractors Have The Right To Offer Other Equivalent Products Or Materials Provided That Technical, Technological, Utility And Quality Parameters Are Ensured, At Least Meeting Or Exceeding The Parameters Of Products Or Materials Required In Swz Or Attachments To Swz. The Obligation To Prove The Equivalence Of The Products Used, Materials, Etc. Will Rest With The Contractor. 5. The Required Warranty Period And Warranty For Defects Is A Minimum Of 60 Months From The Date Of Signing The Final Acceptance Report, With The Warranty Period Is One Of The Offers Evaluation Criteria. 6. The Contracting Authority Informs That Submitting An Offer Must Be Preceded By A Local Vision. 7. The Employer Informs That The Local Vision Should Be Made By 25/09/2025 Until 15:30. In Order To Arrange A Local Vision, Contact The People Appointed For Contact:-P. Agnieszka Grabarska, Tel. (25) 631-20-22 Ext. 11, E-Mail: Tezargi@Korczew.Pl- P. Piotr Kościesz, Tel. (25) 631-20-78, E-Mail: P.Kosciesza@Korczew.Pl 8. The Contractor Will Receive Confirmation After Completing The Local Vision, Which Should Be Attached To The Offer. The Contracting Authority Informs That A Local Vision Is Mandatory. If The Contractor Submits Without Taking A Local Vision, It Will Be Rejected Pursuant To Art. 226 Section 1 Item 18 Of The Public Procurement Law.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.