Tenders Are Invited For Drinking-Water Treatment Plant Construction Work-Tr-Cl-11-Rehabilitation And Extension Of Capture And Treatment Facilities Within The Rosior De Vede Water Food System
Tenders Are Invited For Drinking-Water Treatment Plant Construction Work-Tr-Cl-11-Rehabilitation And Extension Of Capture And Treatment Facilities Within The Rosior De Vede Water Food System
Drinking-Water Treatment Plant Construction Work-Tr-Cl-11-Rehabilitation And Extension Of Capture And Treatment Facilities Within The Rosior De Vede Water Food System. The Tr-Cl-11 Works Contract-The Rehabilitation And Extension Of The Capture And Treatment Facilities Within The Water Supply System Of The Vedea Consists In The Following Works: 1.. Manganese) • Filter Station (For Retaining Precipitates Formed By Iron And Manganese Oxidation) • Elimination Ammonium (By Chlorination At Break-Point) • Adsorbtie With Ass Granular Cobune, Nitriti, Nictrite, Pludi, Stibiu, Seleiu, Bor (Through Reverse Osmosis) • Installation Of Correction Ph • Intermediate Pumping • Chlorination Station • Retention Basin Waste Water • Water Treatment Hall • Online Monitoring Water Quality Parameters • Scada System The Treatment Station Will Be Designed For A Maximum Daily Flow Of 6108 M3/Day. The Contract For The Design And Execution Of The Works For The Objective Rehabilitation And Extension Of The Capture And Treatment Facilities Within The Rosior De Vede Water Supply System Includes: A) The Design Activities - The Technical Execution Project, Which Will Include All The Necessary Documents According To The Legislation And Any Documentation Necessary To Obtain The Opinions And Authorizations; Support For The Beneficiary In Obtaining The Necessary Authorizations And Opinions; B) Construction Works; C) Supply And Installation Of Technological Equipment And Equipment; D) Testing And Commissioning; E) Training Of The Beneficiary Personnel. F) Remediation Of Any Defects That Occur In The Warranty Period. G) During The Execution Period Of The Works, The Contractor Will Also Provide The Technical Assistance From The Designer, With All The Legal Attributions That Are For This Purpose. The Duration Of Design And Execution Of The Works, Commissioning Of The Installations And The Period Of Notification Of The Defects (Warranty) Is 64 Months, Broken Down As Follows: - The Design Stage: 4 Months, - The Execution Period Of The Works And Testing/ Commissioning: 24 Months - The Period Of Notification Of The Defects (Pnd) Is At Least 36 Months. The Contract Remains Valid Until All Obligations Are Fulfilled. The Value Of The Contract Does Not Include Various And Unforeseen Expenses. In The Value Of The Present Contract Tr-Cl-11-The Rehabilitation And Extension Of The Treatment Facilities Within The Rosior De Vede Water Food System-No Provisional Amounts Are Provided.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.