Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Sports City, Renovation Of Take Hall 3 And Swimming Hall - Total Counseling Agreement
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Sports City, Renovation Of Take Hall 3 And Swimming Hall - Total Counseling Agreement
Architectural, Construction, Engineering And Inspection Services - Sports City, Renovation Of Take Hall 3 And Swimming Hall - Total Counseling Agreement. Tendering Of Total Consultancy Regarding Renovation Of Roofs At Hall 3 And Swimming Hall In Lyngby Sports City. Lyngby-Taarbæk Municipality Wants To Renovate The Roofs Of Hall 3 And Swimming Hallstag In Lyngby Sports City. The Project Is Presented In Connection With Repeating Observations Of Water Penetration Through Both Roofs, Which Is Why Solutions Are Desired In This Regard To The Problems Arising. In Addition, The Advisor Must Perform Profitability Calculations In Relation To Whether The Insulation Should Be Expanded In Accordance With Applicable Rules. The Lyngby Swimming Hall Was Built In The Year 1977 And Contrasts With Surrounding Buildings By A Roof Construction That Is Built Over Large Concrete Bucks. The Concrete Bends Contribute To The Spaciousness Of The Swimming Pool. In Addition, It Consists Of Longitudinal Rider Lights, Which Contribute Daylight To The Building. The Swimming Pool Tag Consists Of Horizontal Roofs And Slope Tiles As Incl. Rider Lights Make Up A Total Of Approx. 2,700 M2. In Addition To The Swimming Pool, The Building Houses Several Functions, Including Cafeteria, Changing Rooms And More. The Gym, Also Called Hal 3, Was Built In The Year 1985 And Was Part Of The Expansion Of The Sports Facilities In Lyngby Sports City. The Roof Of The Gym Consists Of Horizontal Roofs And Slope Roofs And Constitutes A Total Of Approx. 1,650 M2. The Main Function Of The Hall Is To House Tennis Courts So That The Tennis Associations Have The Opportunity To Play All Year Round. In Connection With The Renovation Task, The Rest Of Lyngby Idrætsby Must Be In Full Operation, So That Only The Functions That Are Being Rectified. The Assignment Is Offered In Total Counseling Consisting Of Engineering And Architectural Skills. The Developer Would Like The Engineer To Take On The Role Of Total Advisor And Applicant, But This Is Not A Requirement. The Reason For This Is A Desire To Ensure That The Majority Of The Necessary Technical And Design Skills Are Present Internally In The Applicants/Tenderers Organization. Such An Organization Is Considered To Be Able To Contribute To A More Effective Management Of The Projects Technical Solutions To Moisture Problems And Government Relations. The Architectural Benefit Must Ensure That The Existing Architectural Expression Is Preserved, But With The Engineer As A Total Advisor, A Project Organization With Strong Anchoring Is Obtained In The Technical Disciplines, Which Is Considered An Advantage Over The Projects Implementation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.