The University Hospital Düsseldorf Plans To Build A Central Waste Collection Point, Which Will Be Built At The Site Of The Building Today 18.15. The Structure Is Divided Into An Open Courtyard, Around Which An L-Shaped Two-Storey Installation Is Arranged. The Building Is Built In A Solid Construction In Reinforced Concrete, The Structure Of The Partially Covered Courtyard Is Built In Steel Construction. The Development For Vehicles Takes Place Via Large Entrances And Exit Gates, The Development For People Takes Place Via A Staircase With Hydraulic Lifting, Located In Two-Storey Installation. The Building Is Crossed In The Surface Of Channels (A Media Tunnel And A Channel For Automatic Goods Transport), As Well As On A Bunker-Based Bunker-Based. This Results In A Complex Founding Situation Via A System Of Supports, Wall -Like Carriers And Floor Slabs. The Building Receives A Connection To The Channel For Automatic Goods Transport, As Well As A Discharge Station On The Ground Floor. All Walls Loading Allows Are Carried Out In Reinforced Concrete, Non -Supporting Inner Walls Are Built From 24 Pore Concrete, Interior Walls In Sanitary Areas In Lightweight Construction.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.