Tenders Are Invited For ,, Modernization Of Sanitary Nodes In Sp No. 1 In Kłodzko Implemented As Part Of Removing The Effects Of The Flood From September 2024.
Tenders Are Invited For ,, Modernization Of Sanitary Nodes In Sp No. 1 In Kłodzko Implemented As Part Of Removing The Effects Of The Flood From September 2024.
The Order In Question Is Carried Out As Part Of Removing The Effects Of The Flood From September 2024. The Subject Of The Contract Is Described In Detail The Executive Design, Technical Specification Of The Execution And Acceptance Of Works. The Subject Of The Investment Is The Modernization Of Sanitary Rooms In The Central Part Of The School On 4 Floors Of The Facility. In The Sanitary Part Developed, Part Of The Existing Walls Should Be Demolished And New Rooms Have Been Separated According To The Design. In The New Wc Rooms, New Toilet (System) Cabins Should Be Installed, Sanitary Fittings Or Insert A New (According To The Design) And Make A New Wall Cladding In The Form Of Ceramic Tiles. You Should Also Enclose Vertical Shares. It Is Planned To Separate Toilet Adapted To Disabled People Also Available To Teachers. The Floor In Sanitary Rooms Should Be Made Of Non -Slip Ceramic Tiles. In Sanitary Rooms, Walls And Ceilings Are Also Planned. Before Entering The Toilets, An Input Part Is Planned, Which Is An Extension Of The Existing Corridor. This Room Is Planned To Paint Walls, Ceiling And Pvc Floor Covering. In The Rooms, Suspended Ceilings Are Planned To Reduce The Height Of The Rooms On Each Floor To 2.5M. The Scope Of Works In The Field Of Water And Sewage Installations: • Dismantling Of The Water And Sewage System In The Toilet Rooms, • Dismantling Of Sanitary Supplies, • Assembly Of Sanitary Supplies, • Assembly Of Cold And Hot Water Pipelines In A Newly Designed Bathroom • Installation Of The Sanitary Sewage Pipelines, • Installation Tests, • Installation Tests, • Performing Thermal Insulation, Adjusting The Operation Of The Installation. Construction Works: • Demolition Works With Removal Of Debris • Construction Of Partition Walls: Plasterboard, Steel Profiles, Assembly Of Sanitary Partition Walls Made Of Laminate, • Works In The Field Of Construction Joinery, • Plastering, • Execution Of Shedding Surfaces (Pvc), • Laying Of The Tin: Ceramic Floor, Walls - Plates - Plates - Plates - Plates - Plates - Plates - Ceramic, • Installation Of Suspended Ceilings, • Painting And Finishing Works. Announcer Whose Offer Will Be Chosen As The Most Advantageous, Will Be Obliged To Consider Full Cost Estimates (If He Does Not Attach Them To The Offer) And A Material And Financial Schedule; Up To 7 Days From The Date Of Signing The Contract With The Employer. 14. Due To The Fact That Construction Works Will Be Carried Out On An Active Facility, The Contractor Should Adapt The Organization Of His Work To The Needs And Requirements Of The Facilitys Users: Work Particularly Burdensome In Terms Of Noise Must Be Carried Out In The Afternoon.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.