1. The Subject Of The Contract Is The Design In The Design And Build Tasks Entitled: Construction Of The Orlik 2024 Sports Complex Together With The Construction Of A 200 M Circular Treadmill And The Efficiency Obstacle Course At Primary School No. 8 In Chrzanów. 2. The Scope Of The Subject Of The Contract Includes: 1) Development Of Project And Costing Documentation Based On The Attached Functional And Utility Program And Arrangements With Media Considers. A Straight Treadmill And A Long Jumping Jump, • Football Fields, • Multifunctional Pitches, • Sanitary And Cloakroom Building, • Outer Obstacle Course, • Traffic Town, • Small Architecture (Mini Tribune, Benches, Bicycle Stands, Waste Baskets), • Construction Equipment - Connections, Installation And Equipment Necessary For The Functioning Of The Sports Complex: Lighting Of Fields, Treadmills And Terrain, Monitoring And Alarm Installations, • Paved Surfaces: Pedestrian Routes, On Foot, Maneuvering Square, • Fences, • Exit-Additional Connection With The Road From The Northwest Side. 6) Preparation Of As -Built Documentation - 3 Copies: A) Construction Journal, B) Acceptance Reports, Research Reports, Measurements And Other Necessary Reports Confirming The Correct Performance Of Works During Construction, C) As -Built Geodetic Map, D) Material Cards, E) As -Built Cost Estimates, F) Final Permission To Use/Effective. Drawings And Supplementary Descriptions For The Project, For The Implementation Of The Object, If They Were Made, H) A Project With All Possible Changes Introduced In It In The Course Of Construction, I) Research Specified In Section Xi Of The Program Of The Sports Construction Program Orlik Edition 2024. The As -Built Research Is To Include 2 Components: • So -Called Stock-Top-Based Short-Test Testing, • Assessment Of Selected Elements Of The Complex Equipment-Sports Devices. 3. The Scope Of Project Documentation For The Task Entitled Construction Of The Orlik 2024 Sports Complex Together With The Construction Of A 200 M Circular Treadmill And The Efficiency Obstacle Course At Primary School No. 8 In Chrzanów In Accordance With All Regulations And Standards That Apply And Impact On The Completeness And Correctness Of The Project And Contemporary Technical Knowledge In The Extent Necessary To Carry Out The Task Includes, Among Others: 1) Development Of The Map For Design Purposes, 2) Development Of A Construction Project Containing, Among Others Land Development Project, Architectural And Construction Design, Full Industry (5 Copies) Technical Projects, 3) Inventory Of Existing Greenery, Developing A Possible Plan To Cut Trees Colliding With Planned Development And A Plan Of Replacement Plantings, As Well As Obtaining A Decision Allowing For Cutting Trees Together With Possible Replacement Plantings And Costs Related To The Obtained Decision On The Decision Cutting, 4) Developing Geotechnical Conditions Of Foundation (5 Copies), 5) Obtaining All Decisions, Opinions And Arrangements N