3 Adam Chętnik In Nowogród. 2. The Footbridge Aims To Safely Cross The Watercourse Located On The Route Of The Pedestrian Path. Currently, There Is No Adequate Transition In The Place Of This Water Obstacle. The Footbridge Should Be Made In Wooden Technology, Which Is Based On Wooden Poles Attached To Concrete Foundation Feet. 3. The Detailed Scope Of The Order Was Specified In The Project Documentation Constituting Annex 10 To This Swz
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.