Modernization Of Bathrooms (Womens And Mens Sanitary Facilities) On Two Repetitive Floors (Floor Iii And Iv) In The Building, According To The Executive Design. The Contractor Will Plan The Work So That The Bathrooms On Individual Floors Are Carried Out At A Different Time. It Is Possible To Start Work In Bathrooms On The Third Floor Only After Obtaining A Non-Adhesive Protocol Of Work In Bathrooms On The 4Th Floor. Przebidy Scope Of Work:- Demolition And Disassembly Works,- Reparations Of Walls And Floors,- Assembly Of New Partition Walls,- Assembly Of The Suspended Ceiling,- Carpentry Work: Door Installation,- Painting And Tiling Works: Walls Of The Rooms Lined With Glaz And Painted. Acrylic Paint- Sanitary Works: Replacement And Introduction Of New Elements Of Water-Sewage And Ventilation Installations.- Electrical Works. 16:00.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.