GTR 101843856
Tenders Are Invited For Construction Work - Uw Pian Scairolo Cable And Assembly Work
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
101843856
Tendering Authority
Subscribe to view
Tender No
582489-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Uw Pian Scairolo Cable And Assembly Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
06-11-2025
Closed
Work Detail
Construction Work - Uw Pian Scairolo Cable And Assembly Work. A Gu Is Sought For Scairolo For Ul Work, Which Takes Care Of Both The Material And The Assembly On Site. The Following Work Packages Are Included: • Withdrawal Of The Overhauled 66 Kv Cable Of The Two Uls From Vezia In The Existing Cable Duct From The Sleeve In The Gemmo Muffle Shaft To The Existing Piano Scairolo. • Cable Laying For The Two Uls From Vezia With New 132 Kv Cables From Gemmo Muffle Shaft To The Gis In The New Uw Pian Scairolo (Including Introduction To The Gis & Muffe In Gemmo). The Gu-Ul Is Also Responsible For The Cable Application Systems, The Fastening Material, The Bridges, The Cable Seals, Fire Protrusions & Grounds. • Cable Laying With New 132 Kv Cables For The Ul From Mendrisio From The Existing Clipping Portal Pian Scairolo To The Gis In The New Uw Pian Scairolo (Including Introduction To The Gis, New Cable End Lockers, New Kev Scaffolding, New Overvoltage Discounts, Isolators & Their Ground On The Existing Schedule Portal). The Gu-Ul Is Also Responsible For The Cable Application Systems, The Fastening Material, The Bridges, The Cable Seals, Fire Shooters And All Grounds. • Cable Laying With New 15 Kv Cables For The Two Uls 42 & 44 According To Melide From The Irs System In The New Uw Pian Scairolo To The Existing Schedule Portal (Including Introduction To The Irs, New Cable End Locks, New Kev Scaffolding, New Overvoltage Discounts, Isolators & Their Ground On The Existing Scheduling Portal And The Existing Cut-Off Portal). The Gu-Ul Is Also Responsible For The Cable Application Systems, The Fastening Material, The Bridges, The Cable Seals, Fire Shooters And All Grounds. • Interfaces Ul-Pri In The Two Transformers 132 Kv-15 Kv (2 Transformer Cells): 15 Kv Side Is Responsible For The Following: O Cable Lines 15 Kv From The Irs System 15 Kv To The Transformer Cells. The Cable Application Systems, The Fastening Material, The Bridges, Cable Seals, Fire Payments & All Grounds Of The 15 Kv Cables Are Also The Responsibility Of The Gu-Ul. O Cable Climbing In The Transformer Cells Up To And With Copper And Bumping Rail Rails (Including Overvoltage Rod, Cable End Locks, Isolators & Their Grounds). The Cable Assembly Scaffold And Its Grounding Are Also Included In The Scope Of Delivery Of The Gu-Ul. The Cable Application Systems, The Fastening Material, The Bridges, Cable Seals, Fire Payments & All Grounds Of The 15 Kv Cables Are Also The Responsibility Of The Gu-Ul. Since There Is Little Space, The Steel Girders Must Be Attached Directly To The Trafo Fire Protection Wall. The Cable Assembly Scaffold Must Be Newly Dimensioned And Designed For The Project. The Gu-Ul Must Provide A Dwg Or Step File Of This Construction Of The Sbb. Here Are A Few Drawings As An Example: O The Gu-Ul Pulls Down A Copper Tape From The Earthle Railing Along The Cable Assembly Scaffold. This Copperba
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
43ce601b-a91d-46fd-9cd8-199f12a0013e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.