Tenders Are Invited For Architectural, Engineering And Planning Services - Allocation Of Specialist Planning Services Electrical Installation Planning Of Plant Groups 4, 5, 6 And 8 In The Performance Phases 5 To 8 For General Renovation Schorndorf
Tenders Are Invited For Architectural, Engineering And Planning Services - Allocation Of Specialist Planning Services Electrical Installation Planning Of Plant Groups 4, 5, 6 And 8 In The Performance Phases 5 To 8 For General Renovation Schorndorf
Architectural, Engineering And Planning Services - Allocation Of Specialist Planning Services Electrical Installation Planning Of Plant Groups 4, 5, 6 And 8 In The Performance Phases 5 To 8 For General Renovation Schorndorf. The Subject Of The Procedure Is The Subject Of The Procedure, The Awarding Of The Services Of The Specialist Planning Electrical Installation Of Plant Groups 4, 5, 6 And 8 According To §§ 53, 55 Hoai 2021 In A I.V.M. Appendix 15.1 In The Performance Phases 5 To 8 For The General Renovation Of Rems-Murr-Klinikum Schorndorf. The Project Is Divided Into Advance Measures (Station 1, Zpa, Labor) And The Main Measure (Functional Building), As Well As The Additional Services Chapel And Bos Radio Equipment. Preliminary Measures: The Pre -Measures Zpa, Station 1 And Labor Are Currently Still In The Structural Implementation. With The Completion Of Station 1, The Pre -Acceptance Can Therefore Be Completed By July 2026. For The Current Status, Approx. 95 % Of The Construction Work Of The Pre -Measures Are Advertised And Awarded. Only Small Businesses (E.G. Carpenters, Textiles) And Self -Procurement (E.G. Hand -Fire Extinguisher, Signage, Locking System) Are Still Open. The Award And Still Excluding Tenders Can Be Found In The System. The Current Planned Plan Can Be Removed From The System (Performance Level). Main Measure: The Main Measure Has Been Carried Out In Parallel To The Pre -Measures Since The Beginning Of 2024. The Earthworks Along With Concrete On The Floor Slab Have Already Been Completed. The Shell Construction Work In The Ug, Og, And 1. Og Are Already Carried Out, And The 2Nd Floor Is Currently In Execution. According To The Current Status, The Shell Will Be Completed At The End Of 2025. The Structural Completion Is Scheduled For September 2027. So Far, Approx. 24 % Have Been Awarded For The Main Measure, Including The Preparatory Measures (Clearing, Demolition) As Well As The Earth And Shell Construction With Scaffolding Work, Elevator Systems And Facade. The Trades Windows And The Technical Building Equipment (Heating, Ventilation, Sanitary, Electrical, Cold), Medical Technology And Interior Design (Drywall, Screed, Etc.) Have Not Yet Been Assigned. The Award And Still Excluding Tenders Can Be Found In The System. Chapel: Since The Current Construction Measures (Advance Measures + Main Measures) Result In An Additional Space Requirement And The Staff Of Pastoral Care Must Be Accommodated In The Area Of The Chapel, Additional Rooms Must Be Created. It Is Therefore A Meeting Room For 6-8 People And An Office With 2 Jobs To Be Integrated And Implemented Into The Chapel. This Requires A Tecture For The Building Application Documents. The Subject Of The Commission Should Be The Service Phases 1 To 8, Optional Lph. 9. Bos Radio Equipment: With The Building Permit (See System), It Is Required In Point 3.0.01.25 That For The New Building And The Existing Building In The Finished State Of Expansion, There Must Be Sufficient Radio Supply For Portable Bos Radio Devices (In A Constraint On The Body With Spiral Antenna) In The Digital Bos Radio System. Its Davo
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.