Removal Of Fiber Cement Tiles, Handling Of Wood Plot Manually, Manually, Removal Of Metal Scissors, With Greater Or Equal To 8M, Mechanized, 12/09/2025, Ceramic Coating, Removal Of Pillars Of Wood Or Tabuas, Lamp Removal, Removal Of Electrical Ports, Without Port Reuse, Supply And Installation Of Plate With Plate, Pvc Rule Lining, Fried, Ceiling Finishes, Ceramic Baseboard, Plating, Chapisco, Plafon, Split -Type Air Conditioning, Air Conditioning Point, Refrigerated Line With Isolate+1 Module Shot, 2P+T 20A, Included Support And License Plate, Isolated Flexible Copper Cable, 2, 5 Mm², 450/750, 1, Anti-Flame, Light Distribution Table, 4 Mm², 450/750 V, Din-Type Bipolar Circuit Breaker, 16A Nominal Current, Tripo-Spooral Thermomagnetic Circuit Breake. Masonry For Conduits, Corrugated Flexible Conduit, Dn, 32 Mm (1), Roof, Block Sealing Masonry (Reuse) Steel Scissors Installation, Galvanized Steel Rail Number 24, Antipanese Bar, Tempered Glass, Timed Window, Wall With System In Plaster Sheets For Drywall, Masonry Of Ceramic Blocks Hoped Horizontally, Unique Mass In Mortar Trace 1: 2: 18, Two Coats, Acrylic Latex Background Application, Finished Work Cleaning, Junior Work Engineer With Complementary Charges With Charges