Rua Henrique Cordova - 1.1 Local Administration - 1.1.1. Local Works Administration, Henrique Cordova Street - 1.2 Initial Services - 1.2.1. Instalcao Screen Of Prtification, Rua Henrique Cordova - 1.2 Initial Services - 1.2.2. Regularization And Compactness Of Predominant And Sandy Soil Sub -Tract For Pavement Construction Works. Af_09/2024, Rua Henrique Cordova - 1.2 Initial Services - 1.2.3. Manual Cleaning Of Vegetation On Hoeed Terrain. Af_03/2024, Rua Henrique Cordova - 1.2 Initial Services - 1.2.4. Touch Truck 6M³ Stump, Total Gross Weight 16,000 Kg, Maximum Useful Load 11.130 Kg, Distance Between Axes 5, 36 M, Power 185 Hp. Including Hop Of Metal Chp Day. Af06/2014, 12/09/2025, Henrique Cordova Street - 1.2 Initial Services - 1.2.5. Sand Removal, Henrique Cordova Street - 1.3 Playlit Disassembly And Reassembly - 1.3.1. Mounting And Reassembly Of The Playground, Henrique Cordova Street - 1.4 Drainage - 1.4.1. Fish Spine Drain (Ecao (0, 20X0, 40 M), With Perforated Corrugated Ham, 100Mm, Gravel Filling, Wrapped With Geotextile Blanket, Including Connections. Af -07/2021, Rua Henrique Cordova - 1.4 Drainage - 1.4.2. Buried Buried Hydraulic Burning, Internal Dimensions: 0, 6X0, 6X6x0, 5 M. Af- _12/2020, Rua Henrique Cordova - 1.5 Floor Execution For Installation - 1.5.1. Preparation Of The Land, Rua Henrique Cordova - 1.5 Floor Execution For Installation - 1.5.2. Valas, With Percussion Soil Compactor. Af_08/2023, Rua Henrique Cordova - 1.5 Floor Execution - 1.5.4. Floor For Installation - 1.5.5. Slim Concrete Ballast, Applied In Crowning Blocks Or Shoes, 5Cm Thickness. (Caiacao). Af -05/2021, Henrique Cordova Street - 1.7 Revitalization Of The Wire - 1.7.2. (6, 23% Of Direct Cost) - Medication According To The Financial Percentage Of Execution)., Rua Jose Antunes - 1.2 Initial Services - 1.2.1 Instalcao Prtecao Screen., Rua Jose Antunes - 1.2 Initial Services - 1.2.2. Regularization And Compactness Of Predominant And Sandy Soil Sub -Tract For Pavement Construction Works. Af_09/2024., Jose Antunes Street - 1.3 Drainage - 1.3.1. Fish Spine Drain (Ecao (0, Including Connections. Af -07/2021., Jose Antunes Street - 1.3 Drainage - 1.3.2. Reassessing Hexagon Blocks For Interlocked Floor, 6Cm Thickness, With Reuse Of The Heavenly Blocks Included Withdrawal And Placement Of The Material. Floor For Installation - 1.4.1. Slim Concrete Ballast, 5Cm Thickness. Af -01/2024.