1.1. Initial Services - 1.1.1.Admination Local Administration, According To In003/2021 Sie, Art 8-, Iii (6, 23% Of Direct Cost) - Medication According To The Financial Percentage Of Execution), 1.1. Pinus Thickness And Tabuas For Structure, 1.1. Initial Services - 1.1.4. Temporary Construction In Internal Double Plate With Area Liquida Greater Than Or Equal To 6 M2 With Vao To Serve As A Construction Site, 1.2. Land Preparation - 1.2.1. Regularization And Compactness Of Predominantly Clay Soil Sublice For Pavement Construction Works. Af_09/2024, 12/09/2025, 1.2. Land Preparation - 1.2.2. Manual Landfill With Clay-Argile Soil. Af_08/2023, 1.2. Land Preparation - 1.2.3. Sand Tank Removal And Curb, 1.2. Land Preparation - 1.2.4. Trashing Truck 6 M3 Stump, Total Gross Weight 16,000 Kg, Maximum Useful Load 11.130 Kg, Distance Between Axes 5, 36 M, 185 Hp Power, Including Metalic Cacamba - Chp Daytime. Af_06/2014, 1.2. Land Preparation - 1.2.5. Horizontal Transport With Mao Cart, 50 Kg Bags (Unit: Kgxkm). Af_07/2019, 1.2. Land Preparation - 1.2.6. Conventional Work Lease, Using Gabatiro Of Co -Runned Tablets Every 2 Meters, 1.3. Drainage - 1.3.1. Subsuperficial Drain (0, 40 X 0, 40 M), With Perforated Corrugated Hood Tube, Dn 100 Mm, Gravel Filling, Wrapped With Geotextile Blanket. Af_07/2021, 1.3. Bdrening - 1.3.2. Buried Box Distribuidora De Vazao (Multiple Sinks), Rectangular, Masonry With Concrete Blocks, Internal Dimensions: 0, 60 X 0, 60 X H = 0, 50 M. Af_12/2020, 1.3. Drainage - 1.3.3. Circular Sink, In Pre-Molded Concrete, Internal Diameter = 1, 88 M, Internal Height = 2, 00 M, Infiltration Area: 13, 1 M² (For 5 Contributors). Af_12/2020_Pa, 1.4. Structural Elements - 1.4.1. Block Weapon Using 5 Mm Ca -60 Ca -60 - Assembly. Af_01/2024, 1.4. Structural Elements - 1.4.2. Manual Excavation For Crowning Block Or Shoe (Including Excavation For Shape Placement). Af_01/2024, 1.4. Structural Elements - 1.4.3. Block Armament Using 8 Mm Ca -50 Ca -50 - Assembly. Af_01/2024, 1.4. Structural Elements - 1.4.4. Mounting, Assembly And Disassembly Of Baldrame Beam, In Sawn Wood, And = 25 Mm, 4 Uses. Af_01/2024, 1.4. Structural Elements - 1.4.5. Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using Pump - Launch, Densification And Finishing. Af_01/2024, 1.4. Structural Elements - 1.4.6. Manual Application Of Latex Acrylic Wall External House Wall, Two Demands. Af_03/2024, 1.4. Structural Elements - 1.4.7. Acrylic Sealing Background, Manual Wall Application, A Demand. Af_04/2023, 1.5. Countertopiso - 1.5.1. Ballast With Granular Material, Applied To Floor Or Slabs On Soil, *5 Cm *Thickness. Af_01/2024, 1.5. Countertopiso - 1.5.2. Radier Execution, Concrete Floor Or Slab On Soil, Using Q-92 Screen. Af_09/2021, 1.5. Countertopiso - 1.5.3. Radier Concreting, Fck 30 Mpa - Launch, Densification And Finishing. Af_09/2021, 1.5. Countertopiso - 1.5.4. Polished Finish For Reinforced Concrete Floor Or Slab On High Resistance Soil. Af_09/2021, 1.5. Countertopiso - 1.5.5. Treatment Of Dilation Joint With Asphalt Blanket Adhered To Macarico. Af_09/2023, 1.6. Modular Floor - 1.6.1. Modular Floor With Pi