The Object Of The Assignment Is The Demolition Of The Old Existing Fixed Spring Scaffolding (Wooden Pocket + Access) Including A Small Access Platform To The Light Pole, And Its Replacement With A Completely New Floating Spring Scaffolding Consisting Of 1 Fixed And 1 Flowing Access Bridge With Access Platform To The Mast, And 1 Floating Pontoon Slides. Between The Pontoon And The Slipway/Access Channel To The Port Of Doel, A Few Small Protection Tubular Piles Are Placed To Protect Drifts Against The Current Access Bridge.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.