Warrior Training Centerbarrack Phase Ii Utilitiescolumbus Water Worksfort Benning, Georgiasealed Bids For Furnishing All Materials, Labor, Tools, Equipment And Appurtenances Necessary For The Completion Of The Warrior Training Center Barrack - Phase Ii Utilities Will Be Received At The Columbus Water Works At The 1421 Veterans Parkway, Chattahoochee Room, Columbus, Georgia 31901, Until 2:00 P.M., Local Time, On Thursday, October, 9, 2025, And Then At Said Location Publicly Opened And Read Aloud.The Project Consists Of The Following Major Elements: The Construction Of 820 Linear Feet Of 8-Inch Ductile Iron Water Line, 160 Linear Feet Of 6-Inch Ductile Iron Fire Protection Water Line, And 75 Linear Feet Of 6-Inch Pvc Gravity Sewer Located At The Warrior Training Center Barrack Facility On Fort Benning, Ga. The Work Will Be Awarded In One (1) Contract. The Instructions To Bidders, Bid, Contract Agreement, Drawings, Specifications And Forms Of Bid Bond, Performance Bond, Payment Bond And Other Contract Documents May Be Examined At The Following:Columbus Water Works1421 Veterans Parkwaycolumbus, Georgia 31901Krebs Engineering, Inc.2100 River Haven Drive, Suite 100P.O. Box 36309Birmingham, Al 35236(205)987-7411Copies Of Bidding Documents May Be Purchased From The Issuing Office Of Krebs Engineering, Inc. Cost Of Bidding Documents Is $30.00 Per Set. No Part Of The Purchase Price Will Be Refunded. The Bidding Documents May Be Viewed At The Offices Of Krebs Engineering, Inc. And Columbus Water Works. Bidders Wishing To Review The Bidding Documents At The Offices Of Columbus Water Works Should Schedule An Appointment By Calling The Engineering Department At 706.566.9680.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.