Lift Installation Work - Conveyor Systems. New Construction Of Three Part Of The Person In Accordance With En 81-20, Without A Machine Room, Equipment Barrier-Free, 1.0 M/S: A1: Fh ~ 14.5 M, 1000 Kg Load Capacity, 5 Stops, 2-Winged Sliding Doors, Centrally Open; Sk 3.1 M; Sg 1.45 M, Shaft Smoking System; A2: Fh ~ 0.9 M, 630Kg Load Capacity, 2 Stops, Through Charge, 2-Winged Telescopic Sliding Doors; Sk 3.9 M; Sg 1.4 M; A3: Fh ~ 7.8 M, 1250 Kg Load Capacity, 3 Stops, One-Sided, 3-Winged Telescopic Sliding Doors; Sk 3.8 M; Sg 1.4 M.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.