Industrial Inspection Services - Cold, Hot Water Channels, Danube Exam., Esk.Karb.. During The Operation Of The Paks Nuclear Power Plant, The Cooling Water Removed From The Danube Stream Is Heated To The Danube. According To General Weather Trends, The Frequency Of Extremes Increases And The Effect Of Continuous Rise And The Same Trend -Like Temperature Rise (Global Warming), While Adhering To Emission Constraints, Affects The Operation And Operation Of The Blocks. Further Increases The Importance Of Examining The Effects Of Hot Water Injection In The Summer Period (4 Blocks Of Summer Operation) And The Need For Surveys Aimed At The Future Hot Water Emissions Caused By The Planned New Power Plant Blocks. The Best Possible Preparation For Future Critical Periods Is To Know The Process As Accurate As Possible, Which Can Be Provided By Continuous Data Collection. In View Of The Above History, The Entrepreneur Is Responsible For Mvm Paks Nuclear Power Plant Ltd. As A Customer: Investigation Of The Paks Nuclear Power Plant Cold Water And Hot Water Sewerage, Related Water Systems And The Danube Stream, Measurements With Power Plant Measuring Systems, Related Maintenance And Calibration Tasks, Testing And Testing. Preparation Of Tasks Evaluations And Reports As Detailed In The Public Procurement Technical Description (Kml). Some Of The Tasks - Which Is Kml V.2. -It Includes Tasks Related To The Safety Cooling Water System (Bhv System) And Subsystems Detailed-Nuclear Power Plant Systems And System Elements Safety (Abos)* 2 Systems And Equipment. * Classification Of Nuclear Power Plant Systems And System Elements Into A Security Class: Government Decree 1/2022. (Iv. 29.) Oah, Nuclear Safety Regulations (Nbsz), Nbsz Valid Guides, And Nuclear Power Plant Systems, System Elements (Rre) Design, Manufacture, Acquisition, Transform, Operate The Requirements Assigned To Abos 2 Classification By Abos Differentiated Requirements (Abos Dk). The Contracting Authority Concludes A Value -Based Framework Contract For A 341 M Huf Amount For Three Years, Of Which The Appropriation Amount Is For Non -Planned Tasks: 31 M Huf. The Amount Reduced By A Decreased Amount Is Thus 310 M Huf. The Contracting Authority Undertakes To Use 70%Of The Amount Reduced By The Amount Of The Amount (310 M Huf). The Planned Quantities Can Be Permeated Between Each Type Of Task And The Years. I. Quantity Of Public Procurement Designed Occasion Number Of Tests And Tasks 2026 2027 2028 Total (2026-2028) 1. Investigation Of The Danube River And Cooling Spaces 1.1. The Refrigeration Channels And
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.