The Subject Of The Order Is The Construction Of A Nn 0.4Kv Cable Line With Lighting Poles And A Lighting Cabinet For Road Lighting In Dalki Al. Solidarności Commune Gniezno. Another Order Covers: 1. Construction Of The So2 Lighting Cabinet - 1 Set In Accordance With The Technical Conditions Issued By Enea Operator2. Construction Of Nn Cable Line 0.4Kv Cable Yaky 4X25mm2 - 110 Mb3. Construction Of Lighting Columns 8 M - 5 Pcs + Lighting Fixtures 60W.4. Earthworks: Excavations And Backfilling In This Drilling Length 34 M. Rentably With Consent By Co -Owners Of Road Plots, Compensation For Any Damage For Any Possible Damage For Possible, As A Result Of Works, The Contractor Acting On Behalf Of And For The Commune Of Gniezno, Al. Reymonta 9-11, 62-200 Gniezno Based On The Reporting Of Damage To The Commission With The Participation Of The Contractor, Supervisory Inspector And Persons Directly. At The Same Time, The Contractor Is Obliged To Restore The Area To Its Original State. Teren Does Not Require Archaeological Tests. The Contractor Is Obliged To Measure The Electrical Installation. The Exploration Of The Nn Cable Route And The As -Built Inventory Of The Line Should Be Performed By The Geodette.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.