Tenders Are Invited For Recreational Pedestrian And Bicycle Route At Lake Solina In Polańczyk Stage I-Construction Of A Walking And Bicycle Route From Ul. Equal
Tenders Are Invited For Recreational Pedestrian And Bicycle Route At Lake Solina In Polańczyk Stage I-Construction Of A Walking And Bicycle Route From Ul. Equal
The Subject Of The Contract Is The Execution Of Construction Works As Part Of The Task Entitled: Recreational Pedestrian And Bicycle Route At The Solina Lake In Polańczyk Stage I-Construction Of A Pedestrian And Bicycle Route From Equal Street. In The Scope Of Works Planned For Implementation In The Stage And Includes, Among Others: Pedestrian And Bicycle Route From Ul. Equal To The Total Width (Along With The Bands And Slopes) Should Be Dehumidized And Performed (Corner) For Min. Depth 60 Cm. Backfill And Embankments Should Be Made From A Non -Transparent Soil With Density. A Drainage Of Km 0+418.97 Drainage In The Existing Yar At Its Bottom Should Be Made A Drainage Culvert From The Hdpe Dn600 Pipe. Pipe Outlet (Escarpment) Should Be Enclosed With Openwork Concrete Slabs 100 Mm. Places Of Dna And Side Inlet For A Length Of 1.0 M Should Be Paved With A Stone Cube. 8 Cm On The Concrete Foundation Gr. 15 Cm. Drainage Pipe Outlets Should Be Cut According To The Shape Of The Escarpment. The Spaces 20 Cm Wide Around The Pipe Should Be Laid With A Reinforced Concrete Band. Banking Concrete C15/20. C10/15 Primer Concrete. Class A-I. Balustradin Reinforcement At The Height Of A Slope Greater Or Equal To 0.75 M Should Be Made By Balustrades. The Railing Design Is The Same As On The Bridge. Balustrades Should Be Attached To The Concrete Prefabricated Foundations Dug In In The Ground (Band, Embankment Slopes). Road And Informational Knowledge Of The Beginning Of The Route, On The Left Along The String The Investment Information Board Should Be Installed. The Dimensions Of The Array Are 3.0X1.5 M. The Boards Should Be Made Of 5 Mm Thick Aluminum Sheet On The Frame Of Aluminum Angles And Bars Made Of Aluminum Pipes. The Content Of The Board Should Be Agreed With The Contracting Authority. The Array Print Should Be Made On A Self-Adhesive Uv Resistant Foil And Atmospheric Conditions. The Lighting Leafs Of The Walking And Bicycle Route Should Be Installed The Same Lighting Poles As On The Designed Bridge. The Poles Should Be Screwed To Prefabricated Concrete Foundations Dug Into The Ground. The Power Network Should Also Be Made To Power Lighting. Stander Hiker From A Walking And Cycling Route From Ul. Equal To Remove Conflicting Trees With The Investment And Grind Trunks On The Trees Previously Cut. According To The Decision, Planting Should Be Made. The Concise Description Of The Subject Of The Contract Should Be Included In Annex 3 To Swz - Design Documentation And Technical Specification Of Construction And Acceptance Of Construction Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.