The Subject Of The Order Is The Demolition Of The Recreational Platform On The Jesuit Lake In Chmielniki. The Bridge In Question, Due To Poor Technical Condition, Was Intended For Demolition. The Facility Intended For Demolition Is A Permanent Bridge, Consisting Of Five Strings: Three Extended Deep Into The Lake And Two Connecting Them Transversely. At The Ends Of The Strings Perpendicular To The Beach And Edge Of The Lake, Platforms With A Similar Dimensions Of 6.50 X 8.50 M.Parameters Of Individual Platform Strings Are Educated:- State Of Bridge No. 1 Length 48.50 M Width 4.45 M- Bridge String No. 2 Length 51.70 M Width 4.47 M- Pink String No. 3 Length 63.25 M State Of The Bridge No. 4 Length 71.40 M Width 2.50 M- Straight Of Ptry 5 Length 83.70 M Width 2.50 Mpomost Is Based On Steel Pillars Forming Together With Steel Beams From 200 And 180 Mm. The Supporting Structure. A 10 X 10 Cm Wooden Currency Squares Are Screwed To Steel Beams, And 6 Cm Thick Boards To Them Are The Platform Floor. Along The Platform Lines, Railing With A Height Of About 100 Cm Are Placed. Piles Of Balustrade From Steel Angles, Handrail And Crossbars Made Of Wooden Cowings. Steel Poles From Pipes With A Diameter Of 400 Mm Are Stuck Directly Into The Bottom Of The Lake.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.