1) The Subject Of The Order Is The Construction Of A Sanitary Building As Part Of The Task Entitled Development Of The City Market In Łask. 2) The Works Will Take Place On The Basis Of Decision No. 208/2025 Of 09.05.2025 Authorizing The Investor To Start And Conduct Construction Works, In Accordance With The Approved Construction Project, Sign Ab.6740.1.445.2024.Eg94. 3) As Part Of The Subject Of The Contract, It Is Expected To Be Carried Out In Particular The Following Construction Works: • Earthworks, • Reinforced Concrete Structural Works - Foundations, • Construction Works - Feet, Wreaths, Poles, • Substrates, Floors, • Structural And Partition Walls, • Plasters, Walls Of Walls, Painting, • Roof - Roof - Covering And Isolation, • Elevations, • The Control Panel, • Internal Sanitary Sewage System, • Internal Water Supply Installation, • Ventilation And Heating, • Electrical Installation- Tg Board, Internal • Systems:- Paid Toilets- Alarm Toilet- Pc.,- Movement Sensors Checking Whether The Toilet Is In The Toilet- There Is A User Monitoring The Temperature In The Room- Informing About Connecting The Object To Existing And Planned Connections:- Water (Power Supply)- Water (Power Supply Source- Item The Subject Of The Contract Is Only The Construction Of A Sanitary Building With Internal Installations And The Construction Of A Water Supply, Sewage And Power (Wlz) Network On The Plot, As Well As The Delivery And Assembly Of The First Equipment Of The Sanitary Building. 2. For The Door To Sanitary Facilities (Pom. 2 And 3), No Heat Transfer Coefficient Min. 1.3 [W/(M2 ・ K)]), Other Door Parameters According To Design Guidelines. 3 Rc3.4. Finishing Floors In All Rooms, Stoneware Plate With A Degree Of Non -Slip Min. R10.5. Finishing Walls In Sanitary Facilities (Pom. No. 2 And 3) To The Entire Height Of The Room Ceramic Tiles. 6. Finishing Walls In Pom. Technical (Pom. No. 1) - Internal Plasters Ordinary Category Iii. Until 1.5 M High, Make A Lame Of Washable Paints Resistant To Scrubbing Or Finishing From Epoxy Resin. 7. The Panel For Servicing Paid Toilets Is Scheduled On The Front Wall Between The Pom Doors. No. 1 And 2.8. Bet Edges Should Be Performed As A Concrete Cube Protection Against Sliding. 9. When Making A Power Connection To The Building, You Should Also Make Outputs From The Building From The Arot 40/32 Carbite Pipe 5 M For Future Connection For Power Supply To The Polish Switchgear And Power Supply Of The Square. 10. Emergency Luminaires Should Be Installed In Sanitary Rooms No. 2 And 3. The Cost Of The Offer Should Also Include The Costs Of Installing An Additional External Reaper Valve Placed On The Back Wall Of The Building, Which Is Not In The Design Documentation. 12. The Number Of Individual Elements Of The Equipment Strictly According To Department13: Equipment Elements From The Bill Of Quantities. The Quantities And Scope Of Works From The Bill Of Quantities Should Be Treated As An Auxiliary For Determining The Offer Price (It
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.