Tenders Are Invited For Comprehensive Supply Of Electricity For The Needs Of The Poviat Eldership And Organizational Units Of The Secular Poviat In The Period From 01.01.2026 To 31.12.2026.
Tenders Are Invited For Comprehensive Supply Of Electricity For The Needs Of The Poviat Eldership And Organizational Units Of The Secular Poviat In The Period From 01.01.2026 To 31.12.2026.
1. The Subject Of The Contract Is Comprehensive Supply Of Electricity - Delivery With The Distribution Service - In The Period From 01.01.2026. Until 31/12/2026 - Up To 41 Ppe.2. The Total Estimated Volume Of Electricity Constituting The Subject Of The Contract - Approx. 633 610 Kwh. 3. The Forecast Amount Of Electricity, Which Is The Subject Of The Contract, Is Approximate And May Differ From The Actually Collected During The Contract. The Amount Of Electricity Was Estimated On The Basis Of Planned Use (Including A Possible Change In The Use Or Consumption Profile), Historical Data On The Consumption Of Electricity And Taking Into Account The Actions Taken Referred To In Art. 37 Of The Act Of October 7, 2022 On Special Solutions To Protect The Consumers Of Electricity In 2023 In Connection With The Situation On The Electricity Market And Taking Into Account Self -Consumption In The Case Of Recipients With Pv Installations. The Contractor Should Take Into Account Possible Fluctuations In Electricity Consumption. The Reduction Or Increase In The Amount Of Electricity Does Not Attract Any Consequences For The Contracting Authority (Recipients), Except For The Need To Pay For The Amount Of Energy Actually Collected. The Estimated Amount Of Energy Is The Amount That The Employer Intends To Buy And Does Not Include Electricity Produced (And Used) On Its Own. 4. Micro -Installations Are Installed In 14 Buildings - Photovoltaic Panels. Detailed Information On Renewable Energy Installation Can Be Found In Annex 1 To Swz.5. Electricity Produced In Micro -Installations And Introduced Into The Osd Network Will Be Settled In The System: 1) 1) Net Metering - Item 1 In Annex 1 To Swz 2) Net Billing - Item From 2 - 14 In Annex 1 To Swz. 6. Settlement In The Net Metering System, The Contractor Will Settle The Amount Of Electricity Introduced Into The Dso Network In Relation To The Amount Of Electricity Collected From This Network For Its Use For Its Own Needs By A Prosumer Generating Electricity In Micro -Installations With A Total Electrical Installed Power: 1) Greater Than 10 Kw - In Quantitative Ratio 1 To 0.72) Not More Than 10 Kw - Not More Than 10 Kw - In Quantity 0.8.7. Settlement In The Net Billing1 System) The Value Of Electricity Will Be Determined In Accordance With The Provisions Of Art. 4B Of The Roz2 Act) The Contractor In Order To Conduct Settlements According To The Net -Billing System Will Run An Account For The Prosumer Of Renewable Energy, On Which The Amount Of Electricity And Electricity Value Will Be Recorded, And The Resulting Value Of Funds Due To The Prosumer For Electricity For Electricity Introduced Into The Network - Prosumer Deposit. The Amount Of Funds Constituting A Prosumer Deposit May Be Settled On A Prosumer Account For 12 Months From The Date Of Assignment As A Prosumer Deposit On The Prosumer Account. The Amount Of Any Overpayment (The Value Of Unused Electricity In A Period Of 12 Months), Returned By The Contractor, Will Be D
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.