Tenders Are Invited For Delivery And Assembly Of 17 Energy -Saving Lamps With Its Own Power Source As Part Of The Task Installation Of Energy -Saving External Lighting In The Płońsk Poviat
Tenders Are Invited For Delivery And Assembly Of 17 Energy -Saving Lamps With Its Own Power Source As Part Of The Task Installation Of Energy -Saving External Lighting In The Płońsk Poviat
1. The Subject Of The Contract Is The Delivery And Assembly Of 17 Energy -Saving Lamps With Its Own Power Source As Part Of The Task Installation Of Energy -Saving External Lighting In The Płońsk Poviat. Delivery And Installation Of Lighting Will Take Place In Four Locations In The Płońsk Poviat: 1) Installation Of Energy -Saving External Lighting At The Orlik Sports Complex In Raciąż - 4 Pcs 3034W Szimaki-Smardzewo-Sochocin Kolonia-1 Pcs. 4) Installation Of Energy-Saving External Lighting At The Poviat Road No. 3035W From The Road (Sochocin-Konradowo-Malużyn)-Kępa-Smarzewo-2 Pcs. 2. The Subject Of The Contract Assumes The Purchase, Loading, Transport, Unloading And Installation Along With The Launch Of Hybrid Lighting In The Indicated Places In The Płońsk Poviat. The Location Of The Lamps In Individual Locations Was Depicted In The Graphic Attachment, Constituting Annex 1 To The Opz And Its Integral Part. The Removal Before Starting Work By The Contractor Will Indicate The Detailed And Appropriate Location Of Lamps In The Field. The Locations Given In The Attachment May Change. The Scope Of The Order Includes The Supply Of All Elements Necessary To Launch Solar Lamps, Including: Prefabricated Foundations, Lighting Columns, Led Luminaires, Photovoltaic Cells, Batteries, Necessary Attachments And Accommodation Equipment. As Part Of The Order, All Necessary Assembly Elements (E.G. Screws, Pads, Anchors, Clamps, Etc.) Will Be Delivered To Be Delivered. 3. Requirements For Delivery And Assembly Lighting The Order Of The Contract Includes: • Preparation Of The Area For Lighting Assembly, • Delivery And Assembly In The Place Indicated By The Ordering The Galvanized Lighting Pole On The Prefabricated Foundation, • Installation Of Tube Boom, Photovoltaic Cells And Wind Turbine On The Pole Lamp Components (I.E. Batteries, Controllers, Etc.), • Programming Of The Led Lamp Controller And Checking The Correct Operation Of The Supplied Product, Including Electrical Measurements • Appropriate Compaction Of The Substrate After Completed Work And Restoring The Area To The Original State. 4. Basic Required Technical Parameters Of The Lamps • Construction: Round Steel Pole With A Height Of Approx. 8 M, Protected Anti -Corrosion Against Weather Conditions (Galvanized Or Stainless Steel Column), Wall Thickness Min. 4 Mm, Made Of St3s Steel, Round Pole, Narrowing Upwards, Galvanized In The Fire, In The Lower Part Of The Pole, An Audit Hole, Boom Of The Same Material, • Light Source: Led Street Luminaire With A Power Of Not Less Than 30W, Light Color: White, Class Lean Class: Minimum: 500,000H, Operating Temperature: -30 ° C/+50 ° C • Foundation: Prefabricated F -150 Concrete Type With Dimensions Of No Less 150X35x35cm And Weight Not Less Than 250 Kg • Photovoltaic Panel: Two Photovoltaic Polycrystalline Photovoltaic Panels, With A Power Not Less Than 270W • Wind Turbine: 3 -Troubled Wind Turbine With Power. Than 300W, • Battery: Two Pieces With A Capacity Of Min. 150
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.