1. The Subject Of The Task Is The Implementation Of The Investment Entitled: Reconstruction Of Roads In The Grębów Commune. As Part Of The Investment, It Is Planned To Perform Individual Tasks, I.E. The Road In Grębów - Nowy Grębów - Ul. The Palaces Palace Of The Task Includes The Reconstruction Of The Road Over A Section Of 443.60 Mb With A Road Width Of 3.5 Mb. As Part Of The Reconstruction, It Is Primarily Expected To Perform: Strengthening The Existing Foundation With Broken Aggregate, Binding Layer Of 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, Passion, And As -Built Inventory. 2) Reconstruction Of The Road In Grębów - Sokół - Ul. The Calmness Of The Task Includes The Reconstruction Of The Road Over A Section Of 346.20 Mb With A Road Width Of 3.5 Mb. As Part Of The Reconstruction, It Is Primarily Expected To Perform: Strengthening The Existing Foundation With Broken Aggregate. 10 Cm, Binding Layer 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, Passing, And As -Built Inventory. 3) Reconstruction Of The Road In Stalna - Ul. Świerkowasakres Task Includes The Reconstruction Of The Road Over A Section Of 267.00 Mb With A Road Width Of 3.5 Mb. As Part Of The Reconstruction, It Is Primarily Expected To Implement: Foundations With Broken Aggregate. 20 Cm, Binding Layer 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, Passing, And As -Built Inventory. As Part Of The Reconstruction, It Is Primarily Expected To Make: Layer Of Foundation With Broken Aggregate Gr. 20 Cm, Binding Layer 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, And As -Built Inventory. 5) Reconstruction Of The Road In Stalna - Ul. Pogodnazakres Tasks Include The Reconstruction Of The Road Over A Section Of 47.30 Mb With A Road Width Of 3.0 Mb. As Part Of The Reconstruction, It Is Primarily Expected To Make: Milling Of The Existing Surface, The Profile Layer Of 10 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, And As -Built Inventory. 6) Reconstruction Of The Road In Grębów - Ul. The Short -Way Task Includes The Reconstruction Of The Road Over A Section Of 139.50 Mb With A Road Width Of 3.5 Mb. As Part Of The Reconstruction, It Is Primarily Expected To Implement: Foundations With Broken Aggregate. 20 Cm, Binding Layer 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, And As -Built Inventory. As Part Of The Reconstruction, It Is Primarily Expected To Make: Layer Of Foundation With Broken Aggregate Gr. 20 Cm, Binding Layer 4 Cm, Abrasive Layer 4 Cm, Roadside 10 Cm, And As -Built Inventory. 2. The Detailed Scope Of The Subject Of The Contract Is Determined By The Design Documentation And The Technical Specification Of Construction And Acceptance Of Construction Works. The Values Are A Complementary Element That Will Be Taken Into Account Only In The Absence Of Elements Of Works In The Technical Documentation And Constitute An Auxiliary Element Necessary For Settlement.