The Subject Of The Study Is A Construction Project Regarding The Reconstruction Of Poviat Road No. 2221C Miejska Forest-Skrwilno Consisting In The Construction Of A Pedestrian Road In Ruda, In The Existing Road Lane. Technical Parameters Of The Designed Section Of The Road: • Section Length: 662.15M • Technical Class Of The Road: With • Width Of The Road For Pedestrians: 2.0 M Transverse Pedestrian Roads: 2%, As Part Of The Investment In Question, The Reconstruction Of Poviat Road No. 2221C Over A Section Of 661.15 M Consisting In The Construction Of A Section Of 2.00 M Wide With A Concrete Cube Surface. On The Section From Km 0+000.00 To Km 0+220.95, A Pedestrian Road Is Designed Directly On The Road. For Sections From Km 0+220.95 To Km 0+281.92, It Is Designed To Level The Surface Of The Bus Bay. On The Section From Km 0+284.67 To Km 0+305.96, The Road For Pedestrians Is Designed To Be Located In Moving Away From The Road. On The Section From Km 0+319.98 To Km 661.15, A Pedestrian Road Is Designed Directly On The Road. The Beginning Of The Pedestrian Road Is Designed To Be Associated With The Existing Hardening Of The Area. The End Of Pedestrians Is Designed To Be Associated With The Existing Hardening Of The Area. On The Section From Km 0+647 To Km 0+662, The Settings That Protect Pedestrian Traffic Are Designed. The Route In The Situational Plan Was Presented In The Drawing Part Of The Study. The Height Of The Designed Elements Should Be Adjusted To The Existing Terrain And The Existing Edge Of The Road. The Reconstruction Of Exits Is Designed Along The Way. The Location And Parameters Of The Congresses Were Presented In The Drawing Part Of The Study. The Drainage Of The Designed Road Section Will Be Implemented With The Help Of Designed Longitudinal And Transverse Slopes To The Road Lane. Earthworks Should Be Done In Accordance With Pn-S-02205: 1998 Car Roads. Earthworks. Requirements And Research. The Subject Of The Contract Also Includes: 1) Ensuring Adequate Traffic Organization During Conducting Works, Including Ensuring Adequate Marking, 2) Before Starting Works, The Implementation Of The Safety And Health Protection Plan For The Expected Construction Works, If Required, 3) Organization And Development Of Construction Facilities, 4) After Completing The Works, Bringing The Construction Site To Its Original State, Dismantling Of Temporary Facilities And Order Area, 5) Developing Geodetic As -Built Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.