Tenders Are Invited For Performance Of Construction Works In The Scope Of Implementation Of Task No. I Regarding The Renovation Of A Public Building At Ul. Jastrzębia 18-20 In Wrocław
Tenders Are Invited For Performance Of Construction Works In The Scope Of Implementation Of Task No. I Regarding The Renovation Of A Public Building At Ul. Jastrzębia 18-20 In Wrocław
Performance Of Construction Works In The Scope Of Implementation Of Task No. I Regarding The Renovation Of A Public Building At Ul. Jastrzębia 18-20 In Wrocław1. The Subject Of The Procedure And Contract Is To Select A Contractor For Construction Works In The Scope Of The Implementation Of Task No. I Regarding The Renovation Of A Public Building At Ul. Jastrzębia 18-20 In Wrocław. 2. Pursuant To Art. 310 Of The Public Procurement Law, The Contracting Authority Provides For The Possibility Of Annulment Of The Proceedings In Question, If The Public Funds That The Contracting Authority Intended To Allocate To Finance All Or Part Of The Contract, Were Not Granted To It. 3. The Order Includes In Particular: 3.1.1. Terraces And Facades Of The Southern And Western Wing (Secondary Added), I.E. Replacement Of The Surface With The Thermal Insulation And Waterproof Insulation Of The Southern Wing Of The Southern Building - This Range Should Be Made Immediately (In The First Place To Protect It Against The Negative Effects Of Weather Conditions), Repair Of The Rainwater Discharge System With Sheet Metal Machines, Repair, Repair. Crowning And Inter-Storey Cornice, As Well As Renovation Of The Facade, Renovation Of Window And Door Joinery, Renovation Of Metal Balustrades Of The Southern And Western Secondary Extension, 3.1.2. Cleaning And Removal Of Construction Waste After Renovation Works. 4. The Employer Points Out That The Work Will Be Carried Out In An Active Facility, Therefore Special Care And Related Organization Of Work, Security And Order (Systematic Removal Of Dismantled Materials, Systematic Cleaning, Systematic Protection Of Supplied And Installed Materials). 5 Should Be Exercised. 5. After Completed Work, The Room And Place Should Be Organized And Comprehensive As -Built Documentation. 6. The Contracting Authority Provides The Contractor With Appropriate Sanitary Facilities And Unpaid Access To The Media (Water, Electricity), While The Contractor Is Obliged To Ensure At Its Own Expense And Efforts To Meant These Media So That The Contracting Authority Can Pay The Tenant Of The Object For Them. 7. An Integral Part Of Swz Necessary For The Performance Of The Subject Of The Contract Are Materials Attached To Swz, And In Particular Design Documentation With Arrangements, Stwiorb, Bodies Of Works And Others Constituting Annex 9 To Swz (Pdf Files) .8. The Employer Points Out That The Attached Number Is Only An Indicative And Auxiliary Nature, And The Basis For Preparing The Offer And Determining The Scope And Calculation Of The Flat -Rate Price, And Then The Contract Is Documentation Of The Procedure. 9. All Works Performed By The Contractor Should Be Carried Out In Accordance With The Provisions Of The Construction Law, Applicable Standards And Technical Conditions For The Performance And Acceptance Of Works, As Well As Construction Art, Health And Safety Regulations, Fire Protection Regulations, With Respect For The Contracting Authority, The Environ
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.