Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - New Central Clinic - 2.

Tender Detail

101708780
593332-2025
Self-Funded
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - New Central Clinic - 2.
NCB
Western Europe
European Union,G20
09-10-2025

Work Detail

Architectural, Construction, Engineering And Inspection Services - New Central Clinic - 2.. New Central Clinic 2. Ba - University Hospital Bonn (Ukb) The Ukb Extends To 43 Ha On The Venusberg And Has A Campus -Like Character. In The Center Of The Campus, The New Central Clinic Is Being Built, Consisting Of The Heart Center Already Under Construction (1. Ba) And The 2Nd Phase Of Construction (Operational Center B 22). Project Scope Replacement New Building For The Operational Center (B 22) On The Construction Site Of Todays B 26 (Prior Dismantling Required). User Area: 17,789 M² Main Functions: Central Op (21 Op Halls) Intensive Care (48 Beds) General Care (130 Beds) Ambulance & Doctors Service Area Expansion Of Central Radiology (Ct/Mri) Building Structure: Eg, 4 Og, 1 Ug Ko Criteria For The Planning Cost Limit: The Construction Costs (Kg 100-600) Are Set To A Maximum Of 235 Million Euros. This Upper Limit Must Be Observed, Otherwise The Financing Is Not Secured. Sustainability & Energy Efficiency: At Least 10 % Better Energy Efficiency Than The Lowest Energy Building Standard. Bnb Certification At Least Silver. Bim Planning Method: The Entire Construction Project Is Planned Using The Bim Method. The Overall Bim Coordination Lies With The Object Planning. The Planning Task Advertised Here Consists Of The Specialist Planning Of The Technical Equipment For Medical Technology Kg 473 And Kg 620 For The New Central Clinic 2. In More Detail, Information On The Requirements For The Building To Be Planned Can Be Found In The Spatial And Functional Program Together With The Explanatory Report. The Entire Project Team Consisting Of Object Planning And Specific Specialist Planning Is Coordinated By The Object Planning (Architect). In Addition, The Ag Commissioned A Project Control. Template Of Planning Starts: October 2025 Preliminary Planning: Q4/Q1 2025/2026 Design Planning: Q1/Q3 2026 Submission Hu-Bau: September 2026 Construction Application: October 2026 Demolition B 26: Middle End Of Construction Begins: In Early 2028 Award & Commissioning. The Commissioned Planning Company Should Start Immediately After Award. The Client Plans To Gradually Order With Five Performance Levels: Ls 1: Lph 1-2 Ls 2: Lph 3-4 Ls 3: Lph 5 Ls 4: Lph 6-7 Ls 5: Lph 8 The Entire Project Team Is Coordinated By The Object Planning. In Addition, Project Control Is Commissioned.
BootCamp

Key Value

Tender Value
1 - EUR

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail