Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
16-09-2025
Work Detail
Quotation Are Invited For Removal And Re Fixing Of Insulation And Cladding Sheet At M Stationjebel Ali. [Scope Of Work Attached] 1032504258 Insulation Removal Refix Removal And Re Fixing Of Insulation And Cladding Sheet At M Stationjebel Ali. [Scope Of Work Attached] 1 Item-00001 Removal & Re Fixing Of Insulation And Cladding Sheet At M Station Jebel Ali1.#Pre-Bid Site Inspection##The Contractor Shall Visit Th E Site And Make Themselves Fullyfamiliar With The Work Scope, Plant Access, Facilities, Complexities,Etc., Before Submitting The Bid . Dewa Will Not Accept Any Claim Forextras Beyond The Order Rates / Prices During And After The Execution Ofwork Ordered.Contact Det Ails For The Site Visit.1.#Anton Jacob0554607122anton.Jacob@Dewa.Gov.Ae2. #Ranveer Kumar0525546804ranveer.Kumar@Dewa.Gov.A E2.#Qualifi Cation Of Bidder##The Bidder Shall Have Proven Experience For Similar Jobs3.#Scope Of Work##Mobilize Manpower, Equipment, Tools, Etc . Within 24 Hrs. Of Advancenotice.##Collect Ptw (Permit To Work) And Lc (Line Clearance) Documents Fromdewa.##The Following Document S To Be Submitted For Ptw,O#Method Statemento#Risk Assessment Of The Worko#Tool Box Talk Report.##Remove The Claddings And Insulatio N As Per Dewa Engineer#S /Foreman#S Instruction.##Remove Insulation Support Clamps Wherever Required To Repair Theinsulation And Cla Dding Sheets.##Insulation Support Clamps To Be Repaired Based On The Requirement.##The Claddings And Insulation (Patch Wise Or Compl Ete) From Pipes Andequipment As Required##Keep The Removed Insulations And Cladding Sheets In Safe Locations.##All Contractor Staff Engaged In Site Work Shall Use Proper Ppe#Sincluding But Not Limited To Safety Helmet, Gloves, Safety Shoes,Goggles, Face Shield, Co Ver All, Full Body Safety Harness Etc.##Intimate Dewa Personnel In Case Of Any Abnormalities / Damages Foundin The Cladding Sheets.# #Contractor Shall Rectify Any Abnormalities / Deformation Found Inthe Cladding Sheets.##In Case Of Complete Damage Of The Cladding S Heets, Dewa Will Supplynew Cladding Sheets And Contractor Shall Fabricate And Fix The Claddingsheets According To Site Conditions.## Re Fix The Insulation And Cladding Sheet After Clearance From Dewaengineer / Foreman.##Ensure That There Are No Waste / Cloth / Comb Ustible Materialsinside The Insulation / Over The Surface Which May Catch Fire During Hotoperating Conditions##Maintain The Same Thi Ckness Of Insulation As It Was Existing Priorto Remove The Insulation.##Reinstall The Insulation Support Clamps At Same Distance From Wherethese Clamps Were Removed##Make The Groove At The End Of The Cladding Sheet Prior To Fixing It.##Fabrication Of Flat Bar For Insulation Clamp If Found Damaged Is Inthe Contractor#S Scope.##Use The High Temperature Sealant For Cladding Sheet Fixing.##Fix The Cladding Sheets And Ensure That All The Fixing Screws /Rivets Are Properly Installed.##All The Screws, Rivets, Silicon, Sealant, Bi Nding Wire Required Forinsulation Cladding Repair/Fixing Will Be In The Contractor#S Scope.##In Case Of Any Work On/Near Fuel System Only Non-Sparking Tools Areallowed During Removal / Fixing Of The Claddings And Insulations.##Housekeeping Of The Area To Be Done O N Daily Basis And Disposeinsulation Scrap As Per Dewa Instruction.##Job Completion Acceptance Is Subject To Dewa Personnel Inspectio Nand Verification.##Submit Work Completion Report With Clear Photos Within 03 Days Afterwork Completion##After Obtaining Acceptance Of Completion Report From Dewa , Serviceentry To Be Done In The System Within 02 Days By The Contractor.##Payment Will Be Made As Pe R Actual Area Of Insulation Removed And Refixed.##All The Screws / Rivets Required For Insulation Cladding Fixing Willbe In Contract Or Scope.Note: Scope Of Work Mentioned Here Only Provides A Broad Outline Of Thetask. The Bidder Must Review The Adequacy Of The Pro Posed Scope Of Workto Carry Out The Required Tasks And Add Any Additional Work That Isneeded For Satisfactory Completion Of This Pro Ject.4.#Equipment#S Involved But Not Limited To Following##Piping / Headers##Pressure Vessel / Tank##Valves##Tubing##Fittings (Tee, Elbow Etc.)5.#Quantity##Area 100 M² (Insulation Thickness = 400 To 500 Mm)6.#Calculation Of Area##Circumference X Length - For Compl Ete Pipe & Elbows##Length X Breadth # For Box Cutting On Pipe, Elbows, Pressure Vesselor Any Other Equipment Etc.7.#Schedule & Durat Ion##Work To Be Carried Outa.#During M & M Extension Station Block 10/20/30/70 Outages Startingfrom Oct-2025 Up To May-2026. The Exa Ct Schedule Will Be Shared Later.B.#During Any Requirement For Insulation Removal At Site. Contractor Tomobilize And Start The Work Within 24 Hrs. Of Advance Notice.C.#If Required, Work To Be Carried Out Round The Clock In Doubleshifts.8.#Dewa Scope##Scaffolding## Insulations And Cladding Sheets9.#Warranty: -##The Minimum Warranty Period For The Work Shall Be One Year From Thedate Of Completion Of Work Accepted By Dewa.##In Case Of Any Damage/Defect Of The Work Carried Out Under Thiscontract Within This Warranty Period, The Contractor Shall Attend Andcarry Out The Necessary Repair Work And Rectify The Defect Within Shortperiod Without Affecting The Prod Uction Of Electricity And Water##After Successful Completion Of The Job And System Taken In Service,Dewa Will Conduct Thermographic Inspection Of The New Insulation. Anyhotspot Observed During The Scanning Shall Be Rectified / Repaired Bythe Contractor Without Any Additional Cost.10.#General Terms & Conditions##Contractors Shall Visit The Site And Be Fully Familiar With The Workscope, Plant Ac Cess, Facilities, Complexities, Safety Measures Etc.,Before Submitting The Bid.##Contractor Shall Submit Method Of Statement And Sch Edule Uponreceipt Of Po.##The Contractor Shall Ensure Housekeeping Daily And The Contractorshall Be Responsible For All Waste Materi Al Disposals To Designatedplaces.##All Dewa Safety & Environment Policy, Rules And Regulations Shall Befollowed At Work Site During The Execution Of The Work.##The Contractors Engineers Should Be Familiar With Safety Regulationswhile Working In A Hazardous Area.## Scaffolding If Required Shall Be Arranged By Dewa.##Crane If Required Shall Be Arrange By Dewa.##All Rigging And Transporting Equipm Ent Should Be Arranged By Thecontractor.##This Equipment Should Be Duly Tested And Certified By Thethird-Party Inspection Agency And The Certificates Should Be Produce Ondemand.##Qualified Rigger, Mechanics Should Be Provide The Work Shall Beexecuted Under Dewa Su Pervision And As Per Quality/Schedule Requirement.##Contractor Site Supervisor And Safety Officer Shall Be Available Atsite Througho Ut The Period Of Work.##Entry Permits For The Staff/Workers Should Be Applied With Passportcopies Having Valid Visa. Persons, Not In The List, Will Not Be Allow Toenter The Powerhouse.##Entry Permits For The Vehicle Should Be Applied With Copies Ofvehicle Registra Tion At Least 03 Days In Advance.##Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Chemicallab / Fire Department Clearanc Es To Carry Out The Scope Of Work Underthis Contract.##The Contractor Upon Receiving The Work Permit Shall First Ensure Asafe Workin G Condition.##All The Persons Should Wear All The Required Ppe While At Work.##All Material And Tools Brought In Shall Be Declare At Power Stationsecurity Gate And The List Of These Items Shall Be Sign By Dewasecurity. The Copies Of These Documents Shall Be Lodge With Dewaengineer In-Charge On Daily Basis. This Document Will Be The Basis Forthe Clearance (Gate Pass) To Take Them Out On Complet Ion Of The Job.##Service Air, Electricity And Water For Work At Dewa Site. It Is Theresponsibility Of The Contractor To Have His Own Arrangement Inextending The Electricity And Water Utility To His Places Of Workincluding Lighting 100 M2 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332502268)/$Value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.