General Construction Work For Pipelines - Design And Execution Works For The Investment Objective [Setting Up The Sewerage Network In The Villages Lălești, Călimănești, Cristești, Cetățuia, Rotari, Puiești Commune, Vaslui County]. The Contract Has As Object Services For The Elaboration Of The Technical -Economic Documentation The Phases For, Dde And Technical Assistance From The Designer And Execution Of Construction Works Within The Project «Establishment Of Sewerage Network In The Villages Lălești, Călimănești, Cristești, Cetățuia, Rotari, Puiești Commune, The County Of Vaslui, Realization And Adaptation Technical Project Technical Project Phase Of Execution And Execution Details - Technical Verification Of The Technical Project And The Execution Details - The Technical Assistance Of The Designer During The Execution Of The Works - The Realization Of All The Works That Are The Object Of The Feasibility Study - The Realization Of The Tests And Tests Necessary For The Sewerage System, Rotari, Puiești Commune, Vaslui County The Project Aims To Achieve A Sewerage System For A Population Of Approximately 2,631 Inhabitants, Totaling About 1258 Households. A. The Sewerage System For The Localities Of Lalești, Călimănești And Cristești The Totally Served Population: Approximately 1,797 Inhabitants, Representing 848 Households. Components Of Domestic Sewerage System: 1. Gravitational Sewerage Network - Pvc Sn8 Pipes, 250 Mm, In A Total Length Of 20,408 Ml; 2. Pressure Sewerage Network - Pen10 ÷ 16 Pipes, Dn 90 ÷ 140 Mm, In Length Of 3,589 Ml; 3. Pumping Stations Of Waste Water - 7 Stations (Spau 1 - Spau 7); 4. Subversions Of Roads; 5. Individual Connections To The Sewerage Network - 848 Connections; 6.. Wastewater Treatment Plant. B. The Sewerage System For The Localities Of Cetățuia And Rotari Total Service: About 834 Inhabitants, Representing 410 Households. Components Of Domestic Sewerage System: 1. Gravitational Sewerage Network - Pvc Sn8, 250 Mm Pipes, In A Total Length Of 7,224 Ml; 2. Pressure Sewerage Network - Pehd Pn10 Pipes, Dn 90 ÷ 140 Mm, In Length Of 2,939 Ml; 3. Pumping Stations Of Waste Water - 4 Stations (Spau 8 - Spau 11); 4. Subversions Of Roads; 5. Individual Connections To The Sewerage Network - 410 Connections; 6.. Wastewater Treatment Plant. The Estimated Value Was Calculated From The Assembly Of The Following Budget Chapters: 1.2. Land Arrangement = 537.977.20 2 The Necessary Technical Documentation In Order To Obtain The Approvals / Agreements / Authorizations = 11,800.00 3.5.5. The Technical Verification Of The Quality Of The Technical Project And The Execution Details = 58.635.72 3.5.6. Technical Project And Execution Details = 1,300,000,00 3.8.1. Technical Assistance From The Designer = 30,000.00 4.1. Construction And Installations = 24.339.455.93 4.2. Mounting Technological Equipment = 923.417.52 4.3. Machines, Technology Equipment