Architectural, Engineering And Planning Services-25Fei82546 Er-No Traffic Route Concept Complex Construction. 6302 Sonderhausen (A) - Erfurt Hbf (A) In 2028. The 6302 Wolkramshausen - Erfurt Route Is A Single -Track, Non -Electrified Main Railway. It Branches In Wolkramshausen From The Halle - Hann Railway Line. Münden And Leads Via Sondershausen And Straußfurt To Erfurt. Db Infrago Ag Plans The Infrastructure Expansion Of The Erfurt - Nordhausen (Erno) Rail Connection. The Aim Of The Measure Is To Reduce The Travel Time In Rail Passenger Transport Between Erfurt And Nordhausen And Thus Better Connect North Thuringia To The Ice Node Erfurt In The Area. A Total Blocking In The Sonderhausen Area (A) To Erfurt Hbf (A) Is Planned For The Implementation In 2028. In This Total Closure, There Is A Very Strong Construction Site Traffic In The Area Of Rail And The Surrounding Road Network To The Necessary Mass Movement Or Construction Logistical Complexes. In Particular, The Necessary Road Closures At Level Crossings Along The Entire Section Of The Route Must Be Observed Here And The Forced Disturbance Of Private Transport. The Creation Of A Traffic Route Concept For The Complex Construction Measure 6302 Sonderhausen (A) - Erfurt Hbf (A) In 2028 Is Imperative. The Traffic Route Concept Will Be Considered Dynamic When Implementing The Complex Construction Measure In 2028. In Successive Phases In The Area Of Necessary Road Closures At Level Crossings Along The Entire Section Of The Route Will Be Necessary.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.