GTR 101702247
Tenders Are Invited For Modernization Of Existing Lighting For Energy -Saving In The Municipality Of Świdnik - Stage Ii
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
101702247
Tendering Authority
Subscribe to view
Tender No
RIZP 271.13.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Existing Lighting For Energy -Saving In The Municipality Of Świdnik - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-09-2025
Closed
Work Detail
1. The Subject Of The Contract Is The Design And Execution Of Construction Works Entitled: Modernization Of Existing Lighting For Energy -Saving In The Świdnik Municipality - Stage Ii. The Order Is Carried Out As Part Of The B3.4.1 Investment. From The National Plan Of Reconstruction And Increased Re Immorement (Kpo) Investments For A Comprehensive Green City Transformation. 2. The Task Includes Modernization Of The Following System Elements: 1) Implementation Of Project Documentation And Agreeing With The Employer And The Owner Of The Energy Network. 2) Disassembly And Assembly Of Street Lighting Fittings Mounted On The Booms Of The Overhead Line Kpl. 3583) Replacement Of Booms Attached To The Pole Of The Overhead Line Pcs. 309 4) Replacement/Installation Of Wires In Booms Mounted On The Poles Of Overhead Lines Kpl. 3585) Replacement/Installation Of Current Clamps On Overhead Lines 527 8) Replacement Of Pillar Fuse Plates For The Insulated Fuse Connector Pcs 52710) Installation Of The So Lighting Cabinet With Control System With Gprs Tcp/Ip Communication - Set 3611) The Cost Of Admission/Exclusion On The Energy Line On The Nn12 Side) Dismantling And Re -Assembly Of The Electricity Meter - Pcs. 3613) Disassembly In The Lighting Part Of The Distribution Of Lighting Controls14). Making The Power Supply Of The So Kpl Cabinet. 3615) Power Supply Of Overhead Lighting Circuits From The So16 Cabinet) Installation Of The Surge Limiter In Overhead Lines17) Programming Of The Luminaires - Autonomous Profile Of Reducing The Power Capacity Pcs. 88518) Carrying Out Required Tests, Tests And Checks Measurement 88519) Replacement 403 Wz20 Columns) Installation 403 Anodized Aluminum Columns (According To Performed And Agreed In The Pge Project And The Existing Altitudes Of Aluminum Columns Of Led Lighting Created As Part Of Previous Modernization Of A Given Street) Together With The Foundation And Boom 21) Arrangements And Obtaining Admission To The Power Network22) Making As -Built Documentation23) Required Warranty Period And Warranty: For Construction Works - 5 Years, For The Contractor - According To The Contractors Offer - As Not Less Than 10 Years, For Lamps - According To The Contractors Offer But Not Less Than 5 Years, With The Manufacturers Warranty In The Case Of Lighting Columns And Lamps.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4c7368fb-8693-4526-9fb2-93312cd1b0df.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.