In Connection With The Maintenance Of Boya Technique, It Is A Need For An Increase In The Capabilities Of A Load -Capable Crane In Building No. 49 Technical Workshop In Bp 1573. For This Purpose It Is Necessary To Carry Out The Following: Dismantling Of An Available Lifting Facility (Capture Crane) In Building No. 49 Technical Workshop In Bp 1573; Delivery And Installation Of New Crane Bridge Two -War 2X4 T.; Introduction And Transmission Of The Contracting Authority To A New Crane Bridge Two -Hedge 2X4 T.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.