Sewer Survey And Sewage Treatment Consultancy Services - Setting Up A General Development Plan. Hydraulic Calculations, Structural Condition Assessment, Renovation And Measures Development, Various Other Topics. A Maximum Of 4 Applicants Are Requested To Submit The Offer. Evaluation Of The References: The Suitability Is Evaluated Using The References Using The Following Selection Criteria. It Should Be Noted That The References Can Also Be Scored With 0 Points. The Rating With 0 Points Does Not Automatically Lead To Exclusion, But Confirms That The Minimum Criterion Is Observed. However, If The Criterion Is Not Reached To The Approach Of The 0 Points, This Is Considered A Lack Of Reference And The Company Is Excluded. - Creation Gep (Hydraulic Calculation), Conclusion After December 21, 2015 Up To And Including In 6 Months: Weighting = 20 %; 10 Points => 270 Rw And Mw Channel; 5 Points => 235 Km Rw And Mw Channel; 1 Point => 200 Km Rw And Mw Channel; 0 Points = ≥170 Km Rw And Mw Channel. - Illustration Surface Outflow (2D Model), Graduation After 21.12.2020 Up To And Including In 6 Months: Weighting = 10 %; 10 Points = Illustration Of The Drainage Processes On The Surface, Taking Into Account Drainage -Influencing Structures For The Representation Of The Temporal Course Of The Flood Scenarios In Discrete Time Steps At Ezg> 10 Km² Ae, K; 5 Points = Installation Of A 2D Interface Model Made Of Dgm1 Data Of The State Of North Rhine-Westphalia Without Detailing Of Drainage-Influencing Structures With A Size Es Es Es Es Est> 15 Km² Ae, K; 1 Point = Installation Of A 2D Surface Model Made Of Dgm1 Data Of The State Of North Rhine-Westphalia Without Detailing Of Drainage Influencing Structures With A Size Es Ezg> 10 Km² Ae, K; 0 Points = Installation Of A 2D Interface Model Made Of Dgm1 Data Of The State Of North Rhine-Westphalia Without Detailing Of Drainage-Influencing Structures With A Size Es Es Es Es Es Es Es Es Es Es Es, K. - Coupling 1D-2D, Graduation After 21.12.2020 Up To And Including In 6 Months: Weighting = 10 %; 10 Points = Supplement Of The Bidirectionally Coupled Model With Developed Measures In The Sewer Network And On The Surface To Guide The Proof Of Flooding - Proof Of 2 Projects In Which This Service Was Performed; 5 Points = Supplement Of The Bidirectionally Coupled Model With Developed Measures In The Sewer Network And On The Surface To Guide The Proof Of Flooding; 1 Point = Creation Of A Bidirectionally Coupled Overall Model, In Which All Connecting Points (Shafts And Streets) Of The Two Models To Be Coupled Are Incorporated Into The Model As Coupling Points; 0 Points = Creation Of A Simplified Unidirectional Linked Model, In Which The Flood Volumes Determined From The Sewer Network Calculation Are Transferred To The 2D Surface Drainage Model And Are Taken Into Account There As A Source Of Points. - Development Of Heavy Rain Hazard, Conclusion After 21.12.2020 Up To And Including In 6 Months: Weighting = 10 %; 10 Points = Detailed Examination Heavy Rain Problem In One Place Including Hydraulic Calculations And Ups
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.